Beacon Storage (ERCOT-23INR0127) — Project Summary

Queue ID
ERCOT-23INR0127
Capacity
408.7 MW
Technology
Battery
Status
active
Location
Harris, TX
Region
ERCOT
Developer
AES Distributed Energy, Inc
IA Status
Facility Study

Beacon Storage

ERCOT-23INR0127BetaActiveBatteryERCOTLBNL + Live

408.7 MW storage in Harris, TX · In queue since May 2021 · Proposed COD October 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

408.7 MW

Capacity

1

Components

Battery

5y 6m

In Queue

Facility Study

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

8y 5m

Facilities Study50%
Queue EntryMay 5, 2021

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-10-01

Queue history
23INR0127 · 55 monthly ERCOT reports, Mar 2022 – Sep 2026

Projected COD moved

3 times

Dec 2023 → Oct 2029

Net change

+70 months

first report to latest

Capacity

409 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedMay 5, 2021

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

News-reported activity

From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.

Project statusUnder constructionHouston Public Media · 2025-05-15
Latest activitypartnershipThe University of Texas at Dallas · 2025-09-17

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Oct 1, 2029
From queue filing
Developer in saved assessment
AES Distributed Energy, Inc
From queue filing
Status at research time
Active
Active in the ERCOT queue at the Facility Study phase with no interconnection agreement executed; no verified evidence of construction.
Financing
Not recorded
Research sources and reasoning (4 recorded sources)

low confidence at research time

  1. interconnection.fyi/project/ercot-23inr0127
  2. infrasure.ai/project/ercot-23inr0127-beacon-storage
  3. quicksandcheck.com/texas/harris-county/
  4. ercotqueue.com/project/23INR0127

Commercial operation date: The only COD in the evidence is the LBNL/ERCOT proposed date of 2029-10-01. The aggregator pages (infrasure.ai, interconnection.fyi) repeat it from the queue data and are not independent. No developer press release or news article gives a different target.

Developer: The LBNL filing and the aggregator pages (interconnection.fyi, quicksandcheck.com, infrasure.ai) all list AES Distributed Energy, Inc, but they derive from the same queue data. No press release or news confirms the developer or any ownership change. Boomtownindex lists the developer as 'Undisclosed'.

Status: LBNL and the aggregators show Active with a Facility Study IA status and no IA executed. The news-extracted 'under construction' facts come from a Houston Public Media article about a CenterPoint battery groundbreaking and from a UT Dallas/Argonne item, which do not match this AES project. The ercotqueue.com 'Construction' label is unsupported by any other source and conflicts with the Facility Study status.

Project lifecycle
as of 2025-05-15
PhaseConstructionHouston Public Media · 2025-05-15
OperationalNoHouston Public Media · 2025-05-15
TechnologyBatteryHouston Public Media · 2025-05-15
DeveloperSMT EnergyHouston Public Media · 2025-05-15
EPC contractorIrby ConstructionHouston Public Media · 2025-05-15
GroundbreakingAnnouncedHouston Public Media · 2025-05-15

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Beacon Storage is a proposed 408.7 MW battery storage project located in Harris County, Texas. The project, being developed by AES Distributed Energy, Inc., is currently active in the ERCOT interconnection queue as entry ERCOT-23INR0127, with a queue entry date of May 5, 2021. The proposed commercial operation date is October 1, 2029. As of the latest update, the project's interconnection agreement status is Facility Study.

The proposed project has been the subject of recent news coverage, with nine articles published about it. These articles primarily focus on deals related to the project, as well as its potential impact on the grid.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Harris

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

AES Distributed Energy, Inc

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

40450 Deepwater 345kV

Data Source

LBNL + Live

PartnerArgonne National Laboratory±The University of Texas at Dallas · 2025-09-17
CompanyUniversity of Texas at Dallas±The University of Texas at Dallas · 2025-09-17
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_HOUSTON
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (3)Beta

Last updated 2026-04-09

View all articles