Atria Solar (ERCOT-23INR0101) — Project Summary

Queue ID
ERCOT-23INR0101
Capacity
112.4 MW
Technology
Solar
Status
active
Location
Chambers, TX
Region
ERCOT
Developer
Atria Energy Project, LLC
IA Status
Facility Study

Atria Solar

ERCOT-23INR0101BetaActiveSolarERCOTLBNL

112.4 MW generation in Chambers, TX · In queue since October 2020 · Proposed COD December 2025

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

112.4 MW

Capacity

1

Components

Solar

6y 1m

In Queue

Facility Study

IA Phase

COD target: 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

5y 2m

Schedule

11 months past proposed COD

Facilities Study50%
Queue EntryOct 23, 2020

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2025-12-30

Queue history
23INR0101 · 63 monthly ERCOT reports, Oct 2020 – Dec 2025

Projected COD moved

2 times

Apr 2023 → Dec 2025

Net change

+32 months

first report to latest

Capacity

96 → 112 MW

changed in the reports

Latest stage

Cancelled

last listed Dec 2025

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedOct 23, 2020
Facilities study approvedDec 15, 2021
CancelledJan 6, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

News-reported activity
as of 7y 1m ago

From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.

Latest milestoneCOD achieved · 2019-07Midland Reporter-Telegram · 2019-10-03

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
—
Developer in saved assessment
—
From queue filing
Status at research time
Cancelled
Cancelled — ERCOT terminated project January 6, 2026 per community discussion post
Financing
Cancelled

Milestones in this assessment

WithdrawnJan 6, 2026Latest in this assessment

ERCOT cancelled Atria Solar project in Chambers County, 112.40 MW

facebook.com
Research sources and reasoning (2 recorded sources)

medium confidence at research time

  1. facebook.com/groups/626995417961247/posts/1633806680613444/
  2. renewablesinfo.org/project/ercot-23inr0101-atria-solar

Commercial operation date: Facebook post from May 2025 states 'ERCOT cancelled projects January 2026 Atria Solar - Chambers - 01/06/2026 - 112.40 MW', indicating project was cancelled before the LBNL proposed COD of 2025-12-30. No other sources provide COD information.

Developer: Only LBNL filing entity 'Atria Energy Project, LLC' exists. No press releases, corporate announcements, or credible sources identify a parent/operating company. Search results primarily return unrelated entities (Indian residential solar installer 'Atria Solar', Finnish food company 'Atria').

Status: Facebook post from May 2025 explicitly lists 'Atria Solar - Chambers - 01/06/2026 - 112.40 MW' under 'ERCOT cancelled projects January 2026'. LBNL status of 'active' is stale, predating the cancellation.

About

Saved background

Generated Apr 10, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Atria Solar project is a proposed 112.4 MW solar generation facility in Chambers County, Texas. The project, developed by Atria Energy Project, LLC, is located within the ERCOT region and interconnected to the 40770 Hacher 138kV point of interconnection. It entered the ERCOT interconnection queue as project ERCOT-23INR0101 on October 23, 2020, and has a proposed commercial operation date of December 30, 2025. The project's interconnection status is currently in the Facility Study phase.

The Atria Solar project has been featured in recent news coverage related to deals and industry developments.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
  • Queue history observations through: Dec 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Chambers

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Atria Energy Project, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

40770 Hacher 138kV

Data Source

LBNL

DeveloperOccidental PetroleumMidland Reporter-Telegram · 2019-10-03
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_HOUSTON
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (1)Beta

Last updated 2026-03-26

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.