Atria Solar
112.4 MW generation in Chambers, TX · In queue since October 2020 · Proposed COD December 2025
112.4 MW
Capacity
1
Components
Solar
6y 1m
In Queue
Facility Study
IA Phase
COD target: 2025
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
5y 2m
Schedule
11 months past proposed COD
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-12-30
Projected COD moved
2 times
Apr 2023 → Dec 2025
Net change
+32 months
first report to latest
Capacity
96 → 112 MW
changed in the reports
Latest stage
Cancelled
last listed Dec 2025
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Milestones in this assessment
ERCOT cancelled Atria Solar project in Chambers County, 112.40 MW
facebook.comResearch sources and reasoning (2 recorded sources)
medium confidence at research time
- facebook.com/groups/626995417961247/posts/1633806680613444/
- renewablesinfo.org/project/ercot-23inr0101-atria-solar
Commercial operation date: Facebook post from May 2025 states 'ERCOT cancelled projects January 2026 Atria Solar - Chambers - 01/06/2026 - 112.40 MW', indicating project was cancelled before the LBNL proposed COD of 2025-12-30. No other sources provide COD information.
Developer: Only LBNL filing entity 'Atria Energy Project, LLC' exists. No press releases, corporate announcements, or credible sources identify a parent/operating company. Search results primarily return unrelated entities (Indian residential solar installer 'Atria Solar', Finnish food company 'Atria').
Status: Facebook post from May 2025 explicitly lists 'Atria Solar - Chambers - 01/06/2026 - 112.40 MW' under 'ERCOT cancelled projects January 2026'. LBNL status of 'active' is stale, predating the cancellation.
About
Generated Apr 10, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Atria Solar project is a proposed 112.4 MW solar generation facility in Chambers County, Texas. The project, developed by Atria Energy Project, LLC, is located within the ERCOT region and interconnected to the 40770 Hacher 138kV point of interconnection. It entered the ERCOT interconnection queue as project ERCOT-23INR0101 on October 23, 2020, and has a proposed commercial operation date of December 30, 2025. The project's interconnection status is currently in the Facility Study phase.
The Atria Solar project has been featured in recent news coverage related to deals and industry developments.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
- Queue history observations through: Dec 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Chambers
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Atria Energy Project, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
40770 Hacher 138kV
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_HOUSTON
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-26