Atria Solar is a 112 MW Solar project in Texas, currently active.
Atria Energy Project, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2025-12-30.
- Queue ID
- ERCOT-23INR0101
- Location
- Chambers, Texas
- Technology
- Solar
- Developer
- Atria Energy Project, LLC
- Market / region
- ERCOT
- Point of interconnection
- 40770 Hacher 138kV
What stands out
1
Atria Solar is a 112 MW Solar project in Texas with status active.
2
Atria Energy Project, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2025-12-30.
4
Latest linked story: “Oxy opens solar facility in Goldsmith” (Midland Reporter-Telegram, 2019-10-03).
Market and operating context
- Queue date
- 2020-10-23
- Proposed COD
- 2025-12-30
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.