Query
Atria Solar
Type
Entity Briefing
Entity
Atria Solar
Generated
2026-10-19T17:35:28.966Z

Briefing on Atria Solar

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
112 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2025-12-30
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Atria Solar is a 112 MW Solar project in Texas, currently active.

Atria Energy Project, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2025-12-30.

Queue ID
ERCOT-23INR0101
Location
Chambers, Texas
Technology
Solar
Developer
Atria Energy Project, LLC
Market / region
ERCOT
Point of interconnection
40770 Hacher 138kV

What stands out

1

Atria Solar is a 112 MW Solar project in Texas with status active.

2

Atria Energy Project, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2025-12-30.

4

Latest linked story: “Oxy opens solar facility in Goldsmith” (Midland Reporter-Telegram, 2019-10-03).

Market and operating context

Queue date
2020-10-23
Proposed COD
2025-12-30
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Atria Solar — verified asset snapshot

FieldValue
Queue IDERCOT-23INR0101
LocationChambers, Texas
TechnologySolar
DeveloperAtria Energy Project, LLC
Market / regionERCOT
Point of interconnection40770 Hacher 138kV
Queue date2020-10-23
Proposed COD2025-12-30