BRP Pyxis BESS (ERCOT-23INR0094) — Project Summary

Queue ID
ERCOT-23INR0094
Capacity
206.87 MW
Technology
Battery
Status
active
Location
Ward, TX
Region
ERCOT
Developer
BRP Pyxis BESS LLC
IA Status
Facility Study

BRP Pyxis BESS

ERCOT-23INR0094BetaActiveBatteryERCOTLBNL + Live

206.87 MW storage in Ward, TX · In queue since September 2020 · Proposed COD December 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

206.87 MW

Capacity

1

Components

Battery

6y 2m

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

8y 3m

Facilities Study50%
Queue EntrySep 25, 2020

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-12-01

Queue history
23INR0094 · 73 monthly ERCOT reports, Sep 2020 – Sep 2026

Projected COD moved

4 times

Mar 2023 → Dec 2028

Net change

+69 months

first report to latest

Capacity

202 → 207 MW

changed in the reports

Latest stage

Facilities study done

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedSep 25, 2020
Facilities study approvedSep 23, 2021

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Dec 1, 2028
From queue filing
Developer in saved assessment
ENGIE
Filed as BRP Pyxis BESS LLC
Status at research time
Active
Active — Facility Study stage per ERCOT queue, no construction or financing announcements found
Financing
Not recorded
Research sources and reasoning (4 recorded sources)

medium confidence at research time

  1. cleanview.co/power-projects/planned/battery-storage-projects/texas/23INR0094/brp-pyxis-bess
  2. modo-content-service-prod.s3.amazonaws.com/media/reports/2024/05/22/ERCOT_BESS_buildout_report_May_2024_YwMZT0X.xlsx
  3. live.euronext.com/sites/default/files/company_press_releases/attachments/2025/02/27/cpr03_lesechos_16165_1317501_Liste_des_filiales_et_participations_2024.pdf
  4. live.euronext.com/sites/default/files/company_press_releases/attachments/2026/02/26/cpr03_lesechos_16165_1391055_Liste_des_filiales_et_participations_2025.pdf

Commercial operation date: Only LBNL queue data provides a COD of December 2028. No news or press releases found to validate or contradict this target date.

Developer: LBNL filing entity is 'BRP Pyxis BESS LLC', a project-specific shell. ENGIE's 2024 and 2025 subsidiary filings (Euronext regulatory documents) list 'BRP Pyxis BESS LLC' as a 100% owned subsidiary under 'Intégration globale', confirming ENGIE as the parent operating company.

Status: LBNL reports 'active' status at Facility Study stage. No news coverage or press releases found to indicate construction start, financing close, or status change.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The BRP Pyxis BESS project is a proposed 206.87 MW battery storage project located in Ward County, Texas. The developer is BRP Pyxis BESS LLC. It is interconnected within the ERCOT region under queue ID ERCOT-23INR0094, with an interconnection queue entry date of September 25, 2020. The proposed commercial operation date is December 1, 2028.

The project's interconnection status is currently in the Facility Study phase. The point of interconnection is tap 138kV 1009 Yucca - 11197 Sand Tank Pod. The project has appeared in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Ward

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

BRP Pyxis BESS LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

tap 138kV 1009 Yucca - 11197 Sand Tank Pod

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
POI Substation
Yucca Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.