Accalia Point Solar
190.5 MW generation in Cameron, TX · In queue since October 2020 · Proposed COD May 2029
190.5 MW
Capacity
1
Components
Solar
5y 9m
In Queue
Facility Study
IA Phase
COD target: 2029
Total Duration
8y 7m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-05-31
- 2021-09·original developer→Westbridge Renewable Energy Corporationsource
Accalia Point Solar is a proposed 190.5 MW solar generation project located in Cameron County, Texas. The project, developed by Accalia Point Solar LLC, is in the ERCOT interconnection queue as entry ERCOT-23INR0066, with a queue entry date of October 23, 2020. Its proposed commercial operation date is May 31, 2029, and its interconnection status is currently in the Facility Study phase.
The proposed project is linked to the existing Accalia Point Solar, LLC operating plant (EIA ID 66673). The point of interconnection is Tap 345kV 8383 North Edingburg _x0013_ 79501 Kingfisher.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Cameron
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Accalia Point Solar LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345kV 8383 North Edingburg – 79501 Kingfisher
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- MESQUITE_RN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.