190.5 MW generation in Cameron, TX · In queue since October 2020 · Proposed COD May 2029
190.5 MW
Capacity
1
Components
Solar
6y 1m
In Queue
Facility Study
IA Phase
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
8y 7m
Interconnection request submitted to ISO/RTO
SS Completed, FIS Started, No IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-05-31
Projected COD moved
5 times
Jun 2023 → May 2029
Net change
+71 months
first report to latest
Capacity
159 → 191 MW
changed in the reports
Latest stage
Facilities study done
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.
- 2021-09·original developer→Westbridge Renewable Energy Corporationnewsfilecorp.com
Milestones in this assessment
Westbridge Energy acquired 221 MWp Accalia Point Solar project in Cameron County, Texas
newsfilecorp.comWestbridge completed full interconnection studies for Accalia Point Solar
prnewswire.comResearch sources and reasoning (5 recorded sources)
medium confidence at research time
- newsfilecorp.com/release/98014/Westbridge-Energy-Acquires-221-MWp-Texas-Solar-Project
- prnewswire.com/news-releases/westbridge-renewable-completes-full-interconnection-study-at-its-221mwp-texas-solar-project-301819102.html
- linkedin.com/posts/westbridge-energy_westbridge-renewable-completes-full-interconnection-activity-7062788062736486400-g99v
- bicmagazine.com/projects-expansions/renewable-sustainability-h2-esg/westbridge-renewable-completes-full-interconnection-study/
- gem.wiki/Accalia_Point_Solar
Commercial operation date: Only LBNL provides a COD estimate (2029-05-31). No news sources mention a target commercial operation date, so we retain the LBNL date as consensus with low confidence.
Developer: LBNL lists 'Accalia Point Solar LLC' (project SPV). Multiple 2021-2023 sources confirm Westbridge Renewable Energy Corporation acquired and owns the project as the operating parent company.
Status: LBNL status 'active' with 'Facility Study' matches May 2023 announcements that Westbridge completed full interconnection studies. No construction or financing announcements found.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Accalia Point Solar is a proposed 190.5 MW solar generation project located in Cameron County, Texas. The project, developed by Accalia Point Solar LLC, is in the ERCOT interconnection queue as entry ERCOT-23INR0066, with a queue entry date of October 23, 2020. Its proposed commercial operation date is May 31, 2029, and its interconnection status is currently in the Facility Study phase.
The proposed project is linked to the existing Accalia Point Solar, LLC operating plant (EIA ID 66673). The point of interconnection is Tap 345kV 8383 North Edingburg _x0013_ 79501 Kingfisher.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Cameron
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Accalia Point Solar LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345kV 8383 North Edingburg – 79501 Kingfisher
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- MESQUITE_RN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.