Accalia Point Solar (ERCOT-23INR0066) — Project Summary

Queue ID
ERCOT-23INR0066
Capacity
190.5 MW
Technology
Solar
Status
active
Location
Cameron, TX
Region
ERCOT
Developer
Accalia Point Solar LLC
IA Status
Facility Study

Accalia Point Solar

ERCOT-23INR0066BetaActiveSolarERCOTLBNL + Live

190.5 MW generation in Cameron, TX · In queue since October 2020 · Proposed COD May 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

190.5 MW

Capacity

1

Components

Solar

6y 1m

In Queue

Facility Study

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

8y 7m

Facilities Study50%
Queue EntryOct 23, 2020

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-05-31

Queue history
23INR0066 · 68 monthly ERCOT reports, Feb 2021 – Sep 2026

Projected COD moved

5 times

Jun 2023 → May 2029

Net change

+71 months

first report to latest

Capacity

159 → 191 MW

changed in the reports

Latest stage

Facilities study done

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedOct 23, 2020
Facilities study approvedJul 3, 2024

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
2029
From queue filing
Developer in saved assessment
Westbridge Renewable Energy Corporation
Filed as Accalia Point Solar LLC
Status at research time
Active
Active — full interconnection study completed May 2023, project at permitting stage
Financing
Not recorded
Ownership history
  1. 2021-09·original developer→Westbridge Renewable Energy Corporationnewsfilecorp.com

Milestones in this assessment

Ownership changeSep 2021

Westbridge Energy acquired 221 MWp Accalia Point Solar project in Cameron County, Texas

newsfilecorp.com
IA executedMay 2023Latest in this assessment

Westbridge completed full interconnection studies for Accalia Point Solar

prnewswire.com
Research sources and reasoning (5 recorded sources)

medium confidence at research time

  1. newsfilecorp.com/release/98014/Westbridge-Energy-Acquires-221-MWp-Texas-Solar-Project
  2. prnewswire.com/news-releases/westbridge-renewable-completes-full-interconnection-study-at-its-221mwp-texas-solar-project-301819102.html
  3. linkedin.com/posts/westbridge-energy_westbridge-renewable-completes-full-interconnection-activity-7062788062736486400-g99v
  4. bicmagazine.com/projects-expansions/renewable-sustainability-h2-esg/westbridge-renewable-completes-full-interconnection-study/
  5. gem.wiki/Accalia_Point_Solar

Commercial operation date: Only LBNL provides a COD estimate (2029-05-31). No news sources mention a target commercial operation date, so we retain the LBNL date as consensus with low confidence.

Developer: LBNL lists 'Accalia Point Solar LLC' (project SPV). Multiple 2021-2023 sources confirm Westbridge Renewable Energy Corporation acquired and owns the project as the operating parent company.

Status: LBNL status 'active' with 'Facility Study' matches May 2023 announcements that Westbridge completed full interconnection studies. No construction or financing announcements found.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Accalia Point Solar is a proposed 190.5 MW solar generation project located in Cameron County, Texas. The project, developed by Accalia Point Solar LLC, is in the ERCOT interconnection queue as entry ERCOT-23INR0066, with a queue entry date of October 23, 2020. Its proposed commercial operation date is May 31, 2029, and its interconnection status is currently in the Facility Study phase.

The proposed project is linked to the existing Accalia Point Solar, LLC operating plant (EIA ID 66673). The point of interconnection is Tap 345kV 8383 North Edingburg _x0013_ 79501 Kingfisher.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Cameron

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Accalia Point Solar LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345kV 8383 North Edingburg – 79501 Kingfisher

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
HIGH
Nearest Node (Estimated)
MESQUITE_RN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.