Accalia Point Solar (ERCOT-23INR0066) — Project Summary

Queue ID
ERCOT-23INR0066
Capacity
190.5 MW
Technology
Solar
Status
active
Location
Cameron, TX
Region
ERCOT
Developer
Accalia Point Solar LLC
IA Status
Facility Study

Accalia Point Solar

ERCOT-23INR0066BetaActiveSolarERCOTLBNL + Live

190.5 MW generation in Cameron, TX · In queue since October 2020 · Proposed COD May 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

190.5 MW

Capacity

1

Components

Solar

5y 9m

In Queue

Facility Study

IA Phase

COD target: 2029

Interconnection

Total Duration

8y 7m

Facilities Study50%
Queue EntryOct 23, 2020

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-05-31

Cross-source intelligence
Beta
Medium confidence·5 sources·as of 2026-06-01
Expected COD
2029
From queue filing
Developer
Westbridge Renewable Energy Corporation
Filed as Accalia Point Solar LLC
Status
Active
Active — full interconnection study completed May 2023, project at permitting stage
Financing
Unannounced
Ownership history
  1. 2021-09·original developerWestbridge Renewable Energy Corporationsource
Key milestones
Ownership changeSep 2021

Westbridge Energy acquired 221 MWp Accalia Point Solar project in Cameron County, Texas

source
IA executedMay 2023Most recent

Westbridge completed full interconnection studies for Accalia Point Solar

source
About

Accalia Point Solar is a proposed 190.5 MW solar generation project located in Cameron County, Texas. The project, developed by Accalia Point Solar LLC, is in the ERCOT interconnection queue as entry ERCOT-23INR0066, with a queue entry date of October 23, 2020. Its proposed commercial operation date is May 31, 2029, and its interconnection status is currently in the Facility Study phase.

The proposed project is linked to the existing Accalia Point Solar, LLC operating plant (EIA ID 66673). The point of interconnection is Tap 345kV 8383 North Edingburg _x0013_ 79501 Kingfisher.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Cameron

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Accalia Point Solar LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 345kV 8383 North Edingburg – 79501 Kingfisher

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
HIGH
Nearest Node (Estimated)
MESQUITE_RN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Accalia Point Solar
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.