Briefing on Accalia Point Solar

Entity Briefing
Generated Oct 17, 2026·Dataset freshness not reported
191 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2029-05-31
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Accalia Point Solar is a 191 MW Solar project in Texas, currently active.

Accalia Point Solar LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-05-31.

Queue ID
ERCOT-23INR0066
Location
Cameron, Texas
Technology
Solar
Developer
Accalia Point Solar LLC
Market / region
ERCOT
Point of interconnection
Tap 345kV 8383 North Edingburg – 79501 Kingfisher

What stands out

1

Accalia Point Solar is a 191 MW Solar project in Texas with status active.

2

Accalia Point Solar LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2029-05-31.

Market and operating context

Queue date
2020-10-23
Proposed COD
2029-05-31
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Accalia Point Solar — verified asset snapshot

FieldValue
Queue IDERCOT-23INR0066
LocationCameron, Texas
TechnologySolar
DeveloperAccalia Point Solar LLC
Market / regionERCOT
Point of interconnectionTap 345kV 8383 North Edingburg – 79501 Kingfisher
Queue date2020-10-23
Proposed COD2029-05-31