Briefing/projectactive
Accalia Point Solar is a 191 MW Solar project in Texas, currently active.
Accalia Point Solar LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-05-31.
- Queue ID
- ERCOT-23INR0066
- Location
- Cameron, Texas
- Technology
- Solar
- Developer
- Accalia Point Solar LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 345kV 8383 North Edingburg – 79501 Kingfisher
What stands out
1
Accalia Point Solar is a 191 MW Solar project in Texas with status active.
2
Accalia Point Solar LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2029-05-31.
Market and operating context
- Queue date
- 2020-10-23
- Proposed COD
- 2029-05-31
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.