Tabor Solar (ERCOT-23INR0055) — Project Summary

Queue ID
ERCOT-23INR0055
Capacity
506.4 MW
Technology
Solar
Status
active
Location
Hardeman, TX
Region
ERCOT
Developer
Quanah Solar LLC
IA Status
Facility Study

Tabor Solar

ERCOT-23INR0055BetaActiveSolarERCOTLBNL + Live

506.4 MW generation in Hardeman, TX · In queue since September 2020 · Proposed COD April 2027

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

506.4 MW

Capacity

1

Components

Solar

6y 2m

In Queue

Facility Study

IA Phase

COD target: 2027

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

6y 7m

Facilities Study50%
Queue EntrySep 2, 2020

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-04-16

Queue history
23INR0055 · 74 monthly ERCOT reports, Aug 2020 – Sep 2026

Projected COD moved

3 times

May 2023 → Apr 2027

Net change

+47 months

first report to latest

Capacity

506 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedSep 2, 2020

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Apr 16, 2027
From queue filing
Developer in saved assessment
Quanah Solar LLC
From queue filing
Status at research time
Active
Active in ERCOT queue at Facility Study stage with no IA executed; ercotqueue.com shows no IA and a 12% build-chance estimate. No construction or financing news found.
Financing
Not recorded
Research sources and reasoning (4 recorded sources)

low confidence at research time

  1. interconnection.fyi/project/ercot-23inr0055
  2. ercotqueue.com/project/23INR0055
  3. infrasure.ai/project/ercot-23inr0055-tabor-solar
  4. cleanview.co/power-projects/planned/solar-farms/texas/23INR0055/tabor-solar-

Commercial operation date: Only LBNL-derived data exists. Aggregator sites (interconnection.fyi, cleanview) repeat the queue date of April 2027 and are not independent post-LBNL signals; no press release or news gives a financing-backed target.

Developer: Only the LBNL filing entity, Quanah Solar LLC, appears, repeated by aggregators. No parent or operating company was identified, so it cannot be determined whether this is a shell LLC.

Status: LBNL and multiple aggregators report active status with no IA. One aggregator (interxdata) says 'operational', which conflicts with LBNL (is_operational false) and the other sources, so it is treated as unreliable.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Tabor Solar is a proposed 506.4 MW solar generation project located in Hardeman County, Texas. The project, developed by Quanah Solar LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-23INR0055, with a queue entry date of September 2, 2020. The proposed commercial operation date is April 16, 2027.

The project's interconnection status is currently in the Facility Study phase. The point of interconnection is Tap 345kV 60504 Tesla - 61001 Jim Treece. The project has appeared in recent news.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Hardeman

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Quanah Solar LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345kV 60504 Tesla - 61001 Jim Treece

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
Nearest Node (Estimated)
MISAE_GEN_RN
POI Substation
Tesla Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.