Pine Forest BESS
200.74 MW storage in Hopkins, TX · In queue since May 2021 · Proposed COD December 2025
200.74 MW
Capacity
1
Components
Battery
5y 6m
In Queue
IA Executed
IA Phase
Signed Apr 2024
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
2y 11m
IA → COD
1y 8m
Total Duration
2y 11m
Schedule
11 months past proposed COD
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 6–18 months
Proposed COD: 2025-12-31
Projected COD moved
7 times
Jan 2023 → May 2026
Net change
+40 months
first report to latest
Capacity
400 → 201 MW
changed in the reports
Latest stage
Commercial operation
last listed Apr 2026
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.
- 2025-04·Clearway Energy Group (100%)→Clearway Energy Group + AIP Management (equity partner)energy-storage.news
Milestones in this assessment
Standard Generation Interconnection Agreement executed with Oncor Electric Delivery Company
interchange.puc.texas.govAIP Management acquires equity stake for $200M from Clearway Energy Group in 300MWac solar + 200MW/400MWh BESS project
energy-storage.newsProposed commercial operation date per ERCOT interconnection agreement
interchange.puc.texas.govResearch sources and reasoning (4 recorded sources)
high confidence at research time
- energy-storage.news/clear-energy-receives-us200-million-from-aip-management/
- interchange.puc.texas.gov/search/filings/?UtilityType=E&ControlNumber=35077&DocumentType=ALL&SortBy=ItemNumber&SortOrder=Descending
- ftp.puc.texas.gov/public/puct-info/industry/electric/reports/genplant/gentable.xls
- modo-content-service-prod.s3.amazonaws.com/media/reports/2024/09/26/ERCOT_BESS_Buildout_Report_August_2024.xlsx
Commercial operation date: LBNL proposed COD of May 2026 is the only explicit date available. Texas PUC gentable.xls shows 'Dec-25' for a 201 MW Pine Forest BESS, but this likely refers to a separate Phase 2 project (22INR0526 is 200.74 MW vs 201.4 MW for Phase 2). No press releases or news articles provide an updated COD for this specific project.
Developer: LBNL filing entity is 'Pine Forest Hybrid I, LLC' (project SPV). Energy-Storage.News (Apr 2025) reports AIP Management acquired equity stake in Pine Forest from Clearway Energy Group for $200M, indicating Clearway was the developer/owner with AIP now as co-investor.
Status: LBNL shows 'active' with IA executed 2024-04-10. April 2025 financing announcement confirms project is advancing toward construction. No signals of delay or withdrawal.
About
Generated Apr 10, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Pine Forest BESS is a proposed 200.74 MW battery storage project in Hopkins County, Texas. The project, developed by Pine Forest Hybrid I, LLC, is located within the ERCOT region and consists entirely of battery storage.
The project entered the ERCOT interconnection queue as entry 22INR0526 on May 4, 2021, with a proposed commercial operation date of February 27, 2026. The interconnection agreement for the project was executed on April 10, 2024. The point of interconnection is at the tap 345kV 1696 Monticello SES - 2514 Allen Switch.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
- Queue history observations through: Apr 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Hopkins
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Pine Forest Hybrid I, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
tap 345kV 1696 Monticello SES - 2514 Allen Switch
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- MEDIUM
- POI Substation
- Monticello substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.