Pine Forest BESS is a 201 MW Battery project in Texas, currently active.
Pine Forest Hybrid I, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2026-05-20.
- Queue ID
- ERCOT-22INR0526
- Location
- Hopkins, Texas
- Technology
- Battery
- Developer
- Pine Forest Hybrid I, LLC
- Market / region
- ERCOT
- Point of interconnection
- tap 345kV 1696 Monticello SES - 2514 Allen Switch
What stands out
1
Pine Forest BESS is a 201 MW Battery project in Texas with status active.
2
Pine Forest Hybrid I, LLC is the reported developer.
3
The reported queue phase is IA Executed; proposed COD is 2026-05-20.
Market and operating context
- Queue date
- 2021-05-04
- Proposed COD
- 2026-05-20
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.