Pachanga Wind (ERCOT-22INR0480) — Project Summary

Queue ID
ERCOT-22INR0480
Capacity
300 MW
Technology
Wind
Status
active
Location
Cameron, TX
Region
ERCOT
Developer
Pachanga Wind LLC
IA Status
Facility Study

Pachanga Wind

ERCOT-22INR0480BetaActiveWindERCOTLBNL + Live

300 MW generation in Cameron, TX · In queue since February 2021 · Proposed COD April 2030

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

300 MW

Capacity

1

Components

Wind

5y 9m

In Queue

Facility Study

IA Phase

COD target: 2030

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

9y 2m

Facilities Study50%
Queue EntryFeb 9, 2021

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2030-04-08

Queue history
22INR0480 · 66 monthly ERCOT reports, Apr 2021 – Sep 2026

Projected COD moved

4 times

Jul 2023 → Apr 2030

Net change

+81 months

first report to latest

Capacity

300 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedFeb 9, 2021

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Apr 8, 2030
From queue filing
Developer in saved assessment
—
From queue filing
Status at research time
Active
Active in ERCOT queue at Facility Study stage with no IA executed; no construction, permitting, or financing news found.
Financing
Not recorded
Research sources and reasoning (5 recorded sources)

low confidence at research time

  1. infrasure.ai/project/ercot-22inr0480-pachanga-wind
  2. ercotqueue.com/project/22INR0480
  3. interconnection.fyi/project/ercot-22inr0480
  4. cleanview.co/power-projects/planned/wind-farms/texas/22INR0480/pachanga-wind-
  5. bizapedia.com/tx/pachanga-wind-llc.html

Commercial operation date: Only the LBNL/ERCOT proposed COD of 2030-04-08 exists; aggregator sites (cleanview, infrasure) repeat it from the same queue data and add no independent developer-backed target. No press releases or news give a different date.

Developer: Only the project LLC is identified. Corporate registry results show a Texas LLC formed 2021-02-01 with an Austin registered address, but no parent or operating company is named in any source.

Status: LBNL and queue trackers (interconnection.fyi, ercotqueue.com) agree the project is active with no IA. The interxdata 'operational' label conflicts with all other sources and is likely a data error. ercotqueue.com lists a 19% build-chance.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Pachanga Wind is a proposed 300 MW wind generation project located in Cameron County, Texas. The project, developed by Pachanga Wind LLC, is currently in the ERCOT interconnection queue as entry ERCOT-22INR0480, with a queue entry date of February 9, 2021. Its proposed commercial operation date is April 8, 2030, and its interconnection agreement status is currently in the Facility Study phase.

The proposed project consists of 300 MW of wind generation capacity. It is planned to interconnect at the tap 345kV 5966 Palmito - 80137 Stewart Rd point of interconnection. The Pachanga Wind project has appeared in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Cameron

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Pachanga Wind LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

tap 345kV 5966 Palmito - 80137 Stewart Rd

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
MEDIUM
POI Substation
Palmito Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.