Sandow Solar (ERCOT-22INR0350) — Project Summary

Queue ID
ERCOT-22INR0350
Capacity
287.18 MW
Technology
Solar
Status
active
Location
Milam, TX
Region
ERCOT
Developer
Sandow Lakes Ranch Solar I, LLC
IA Status
Facility Study

Sandow Solar

ERCOT-22INR0350BetaActiveSolarERCOTLBNL + Live

287.18 MW generation in Milam, TX · In queue since September 2020 · Proposed COD June 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

287.18 MW

Capacity

1

Components

Solar

6y 2m

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

7y 9m

Facilities Study50%
Queue EntrySep 11, 2020

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Completed, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-06-01

Queue history
22INR0350 · 74 monthly ERCOT reports, Jun 2020 – Sep 2026

Projected COD moved

7 times

May 2022 → Jun 2028

Net change

+73 months

first report to latest

Capacity

290 → 287 MW

changed in the reports

Latest stage

Facilities study done

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedSep 11, 2020
Facilities study approvedJul 18, 2024
On ERCOT's inactive listApr 2025 – May 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Jun 1, 2028
From queue filing
Developer in saved assessment
Sandow Lakes Ranch
Filed as Sandow Lakes Ranch Solar I, LLC
Status at research time
Active
Active — Facility Study stage, no construction or financing announcements found for this generation project
Financing
Not recorded
Research sources and reasoning (9 recorded sources)

low confidence at research time

  1. constructionreviewonline.com/t1-chooses-milam-county-texas-for-850m-5-gw-solar-cell-manufacturing-facility/
  2. electrek.co/2025/06/16/t1-energy-freyr-5-gw-us-solar-factory/
  3. urbanland.uli.org/development-and-construction/project-profile-texas-triangle-to-get-economic-boost-from-advanced-manufacturing-and-logistics-center
  4. bizjournals.com/austin/news/2025/03/17/t1-freyr-battery-manufacturing-facility-alcoa.html
  5. kxxv.com/news/local-news/milam-county-approves-first-phase-of-a-new-t1-energy-manufacturing-hub-at-the-old-alcoa-aluminum-site
  6. assets.comptroller.texas.gov/ch313/1836/1836-rockdale-sandow-findings.pdf
  7. interconnection.fyi/project/ercot-22inr0350
  8. renewablesinfo.org/project/ercot-22inr0350-sandow-solar
  9. ercotqueue.com/project/22INR0350

Commercial operation date: Only LBNL provides a COD estimate (June 2028). No press releases or news articles mention construction timeline, financing, or operational targets for this specific solar generation project. All search results discuss T1 Energy's manufacturing facility at the broader Sandow Lakes site, not the Sandow Solar generation project itself.

Developer: LBNL filing uses project-LLC 'Sandow Lakes Ranch Solar I, LLC'. Search results and Texas Comptroller documents reference the broader Sandow Lakes Ranch master development as the parent entity. No operating solar company (e.g., NextEra, Intersect) is identified as developer.

Status: LBNL status is 'active' at Facility Study stage. No contradictory evidence found. Search results focus on T1 Energy's manufacturing facility at the same site, not the solar generation project.

Project lifecycle
as of 2025-04-10
OperationalNoAustin American-Statesman · 2025-04-10
TechnologygasAustin American-Statesman · 2025-04-10
DeveloperSandow Lakes EnergyAustin American-Statesman · 2025-04-10

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Sandow Solar is a proposed 287.18 MW solar generation project located in Milam County, Texas. The developer is Sandow Lakes Ranch Solar I, LLC. The project is in the ERCOT interconnection queue as entry ERCOT-22INR0350, with a queue entry date of September 11, 2020, and a proposed commercial operation date of June 1, 2028. Its interconnection agreement status is currently Facility Study. The point of interconnection is tap one 345kV 7040 Austrop - 13429 Sandow line.

The project is linked to the existing Walleye Solar (Sandow II) operating plant (EIA ID 68231). Sandow Solar has been mentioned in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Milam

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Sandow Lakes Ranch Solar I, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

tap one 345kV 7040 Austrop - 13429 Sandow line

Data Source

LBNL + Live

DeveloperSandow Lakes EnergyAustin American-Statesman · 2025-04-10
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.