Sandow Solar is a 287 MW Solar project in Texas, currently active.
Sandow Lakes Ranch Solar I, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-06-01.
- Queue ID
- ERCOT-22INR0350
- Location
- Milam, Texas
- Technology
- Solar
- Developer
- Sandow Lakes Ranch Solar I, LLC
- Market / region
- ERCOT
- Point of interconnection
- tap one 345kV 7040 Austrop - 13429 Sandow line
What stands out
Sandow Solar is a 287 MW Solar project in Texas with status active.
Sandow Lakes Ranch Solar I, LLC is the reported developer.
The reported queue phase is Facility Study; proposed COD is 2028-06-01.
Latest linked story: “Sandow Lakes' natural gas power plant location was its selling point. Until it wasn't.” (Austin American-Statesman, 2025-04-10).
Market and operating context
- Queue date
- 2020-09-11
- Proposed COD
- 2028-06-01
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.