Matagorda Solar
101 MW generation in Matagorda, TX · In queue since May 2020 · Proposed COD August 2027
101 MW
Capacity
1
Components
Solar
6y 6m
In Queue
IA Executed
IA Phase
Signed Jun 2022
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
2y 1m
IA → COD
5y 2m
Total Duration
2y 1m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
SS Completed, FIS Completed, IA
Project under construction
Typical: 12–24 months
Proposed COD: 2027-08-25
Projected COD moved
4 times
Jun 2023 → Aug 2027
Net change
+50 months
first report to latest
Capacity
81 → 101 MW
changed in the reports
Latest stage
IA signed
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.
Milestones in this assessment
Google signed 15-year PPA with Linea Energy for 500MW solar in Matagorda County
esgtoday.comResearch sources and reasoning (4 recorded sources)
high confidence at research time
- esgtoday.com/google-signs-500-mw-solar-deal-to-power-texas-data-centers/
- datacenterdynamics.com/en/news/google-inks-15-year-500mw-solar-ppa-with-linea-energy-in-texas/
- baycitytribune.com/news/google-solar-deal-adds-fuel-to-matagorda-data-center-debate/article_b910f647-7225-4c85-a111-a4aab5c3bbf4.html
- interconnection.fyi/project/ercot-22inr0342
Commercial operation date: LBNL queue shows proposed COD of 2027-08-25. No news sources provide an updated or conflicting COD target. Google PPA announcement (3 weeks ago) confirms project viability but doesn't specify construction timeline.
Developer: LBNL filing uses project LLC 'Matagorda Solar Farm, LLC'. Multiple recent sources (Data Center Dynamics, ESG Today, Orrick, Renewables Now) identify Linea Energy as the operating developer and PPA counterparty with Google for 500MW solar in Matagorda County.
Status: LBNL status is 'active' with IA executed in 2022. Recent Google PPA announcement confirms project is advancing with offtake secured, though no groundbreaking or construction start date has been announced.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Matagorda Solar project is a proposed 101 MW solar generation project located in Matagorda County, Texas. Developed by Leeward Renewable Energy Development, LLC, the project is interconnected within the ERCOT region under queue ID ERCOT-22INR0342. The project entered the interconnection queue on May 1, 2020, and has a proposed commercial operation date of August 25, 2027.
The project's Interconnection Agreement (IA) was executed on June 8, 2022. The point of interconnection is the 5555 Shropshire 69kV substation. The Matagorda Solar project has been mentioned in recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Matagorda
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Matagorda Solar Farm, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
5555 Shropshire 69kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_HOUSTON
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-04-09
View all articlesMatagorda Solar
Data-driven briefing on Matagorda Solar — fleet, generation, financial, and news signals.
RP SCG Texas Solar
Summary analysis with parallel narrative sections and visualizations.
Ord
Data-driven briefing on Ord — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.