Query
Matagorda Solar
Type
Entity Briefing
Entity
Matagorda Solar
Generated
2026-10-20T00:16:18.570Z

Briefing on Matagorda Solar

Entity Briefing
Generated Oct 20, 2026·Dataset freshness not reported
101 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2027-08-25
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Matagorda Solar is a 101 MW Solar project in Texas, currently active.

Matagorda Solar Farm, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2027-08-25.

Queue ID
ERCOT-22INR0342
Location
Matagorda, Texas
Technology
Solar
Developer
Matagorda Solar Farm, LLC
Market / region
ERCOT
Point of interconnection
5555 Shropshire 69kV

What stands out

1

Matagorda Solar is a 101 MW Solar project in Texas with status active.

2

Matagorda Solar Farm, LLC is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2027-08-25.

4

Latest linked story: “X-Energy, DOW Select Texas Site for SMR Power Plant” (Neutron Bytes, 2023-05-12).

Market and operating context

Queue date
2020-05-01
Proposed COD
2027-08-25
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Matagorda Solar — verified asset snapshot

FieldValue
Queue IDERCOT-22INR0342
LocationMatagorda, Texas
TechnologySolar
DeveloperMatagorda Solar Farm, LLC
Market / regionERCOT
Point of interconnection5555 Shropshire 69kV
Queue date2020-05-01
Proposed COD2027-08-25