Matagorda Solar is a 101 MW Solar project in Texas, currently active.
Matagorda Solar Farm, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2027-08-25.
- Queue ID
- ERCOT-22INR0342
- Location
- Matagorda, Texas
- Technology
- Solar
- Developer
- Matagorda Solar Farm, LLC
- Market / region
- ERCOT
- Point of interconnection
- 5555 Shropshire 69kV
What stands out
1
Matagorda Solar is a 101 MW Solar project in Texas with status active.
2
Matagorda Solar Farm, LLC is the reported developer.
3
The reported queue phase is IA Executed; proposed COD is 2027-08-25.
4
Latest linked story: “X-Energy, DOW Select Texas Site for SMR Power Plant” (Neutron Bytes, 2023-05-12).
Market and operating context
- Queue date
- 2020-05-01
- Proposed COD
- 2027-08-25
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.