Clutch City Solar Phase I (ERCOT-22INR0279) — Project Summary

Queue ID
ERCOT-22INR0279
Capacity
200.75 MW
Technology
Solar
Status
active
Location
Brazoria, TX
Region
ERCOT
Developer
HZ Solar I, LLC
IA Status
IA Executed

Clutch City Solar Phase I

ERCOT-22INR0279BetaActiveSolarERCOTLBNL + Live

200.75 MW generation in Brazoria, TX · In queue since January 2020 · Proposed COD July 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

200.75 MW

Capacity

1

Components

Solar

6y 10m

In Queue

IA Executed

IA Phase

Signed Sep 2022

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

2y 8m

IA → COD

5y 10m

Total Duration

2y 8m

Construction75%
Queue EntryJan 22, 2020

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementSep 30, 2022

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Started, IA

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2028-07-01

Queue history
22INR0279 · 79 monthly ERCOT reports, Feb 2020 – Sep 2026

Projected COD moved

4 times

Dec 2022 → Jul 2028

Net change

+67 months

first report to latest

Capacity

204 → 201 MW

changed in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJan 22, 2020
Facilities study approvedApr 16, 2024
Interconnection agreement signedSep 30, 2022
On ERCOT's inactive listMay 2022 – May 2022

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
2028
From queue filing
Developer in saved assessment
HZ Solar I, LLC
From queue filing
Status at research time
Active
Active — IA Executed (Sept 2022), FIS pending, estimated 20-39% build probability per queue analytics
Financing
Not recorded

Milestones in this assessment

IA executedSep 30, 2022Latest in this assessment

Interconnection Agreement executed with ERCOT

interconnection.fyi
Research sources and reasoning (6 recorded sources)

medium confidence at research time

  1. interconnection.fyi/project/ercot-22inr0279
  2. ercot.com/files/docs/2025/04/04/Capacity-Changes-by-Fuel-Type-Charts_March_2025.xlsx
  3. ercot.com/files/docs/2026/01/08/Capacity-Changes-by-Fuel-Type-Charts_December_2025.xlsx
  4. ercot.com/files/docs/2025/06/06/Capacity-Changes-by-Fuel-Type-Charts_May_2025.xlsx
  5. ercotqueue.com/project/22INR0279
  6. ercot.com/files/docs/2024/11/01/MORA_January2025.xlsx

Commercial operation date: LBNL queue shows July 1, 2028 COD. ERCOT capacity planning documents from 2024-2026 consistently list 2028 as target year, with one November 2024 MORA document showing '2026' which appears to be an outlier. Consensus is 2028, though one ERCOT document suggested earlier 2026 timeline.

Developer: All sources consistently identify HZ Solar I, LLC as the developer with no evidence of a parent company or operating entity. No press releases, acquisitions, or corporate announcements found to suggest this is a shell LLC for a larger developer.

Status: LBNL shows 'Active' with IA Executed status from September 2022. Multiple ERCOT queue tracking sites confirm active status with Facilities Interconnection Study (FIS) still pending as of 2026.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Clutch City Solar Phase I is a proposed 200.75 MW solar generation project located in Brazoria County, Texas. The project, developed by HZ Solar I, LLC, is in the ERCOT interconnection queue as entry ERCOT-22INR0279, with a queue entry date of January 22, 2020. The proposed commercial operation date is July 1, 2028.

The project's Interconnection Agreement (IA) was executed on September 30, 2022. The point of interconnection is tap 138kV 42960 Mustang Bayou _x0013_ 42100 Hudson CKT #04.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Brazoria

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

HZ Solar I, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

tap 138kV 42960 Mustang Bayou – 42100 Hudson CKT #04

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_HOUSTON
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (1)Beta

Last updated 2026-03-26

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.