Briefing/projectactive
Clutch City Solar Phase I is a 201 MW Solar project in Texas, currently active.
HZ Solar I, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2028-07-01.
- Queue ID
- ERCOT-22INR0279
- Location
- Brazoria, Texas
- Technology
- Solar
- Developer
- HZ Solar I, LLC
- Market / region
- ERCOT
- Point of interconnection
- tap 138kV 42960 Mustang Bayou – 42100 Hudson CKT #04
What stands out
1
Clutch City Solar Phase I is a 201 MW Solar project in Texas with status active.
2
HZ Solar I, LLC is the reported developer.
3
The reported queue phase is IA Executed; proposed COD is 2028-07-01.
4
Latest linked story: “Texas Adds Two More Utility-Scale Solar Power Projects” (POWER Magazine, 2024-02-28).
Market and operating context
- Queue date
- 2020-01-22
- Proposed COD
- 2028-07-01
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.