Query
Clutch City Solar Phase I
Type
Entity Briefing
Entity
Clutch City Solar Phase I
Generated
2026-10-19T16:06:18.455Z

Briefing on Clutch City Solar Phase I

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
201 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2028-07-01
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Clutch City Solar Phase I is a 201 MW Solar project in Texas, currently active.

HZ Solar I, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2028-07-01.

Queue ID
ERCOT-22INR0279
Location
Brazoria, Texas
Technology
Solar
Developer
HZ Solar I, LLC
Market / region
ERCOT
Point of interconnection
tap 138kV 42960 Mustang Bayou – 42100 Hudson CKT #04

What stands out

1

Clutch City Solar Phase I is a 201 MW Solar project in Texas with status active.

2

HZ Solar I, LLC is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2028-07-01.

4

Latest linked story: “Texas Adds Two More Utility-Scale Solar Power Projects” (POWER Magazine, 2024-02-28).

Market and operating context

Queue date
2020-01-22
Proposed COD
2028-07-01
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Clutch City Solar Phase I — verified asset snapshot

FieldValue
Queue IDERCOT-22INR0279
LocationBrazoria, Texas
TechnologySolar
DeveloperHZ Solar I, LLC
Market / regionERCOT
Point of interconnectiontap 138kV 42960 Mustang Bayou – 42100 Hudson CKT #04
Queue date2020-01-22
Proposed COD2028-07-01