Dorado Solar (ERCOT-22INR0261) — Project Summary

Queue ID
ERCOT-22INR0261
Capacity
401.35 MW
Technology
Solar
Status
active
Location
Callahan, TX
Region
ERCOT
Developer
Enbridge Solar (Sequoia I), LLC
IA Status
IA Executed

Dorado Solar

ERCOT-22INR0261BetaActiveSolarERCOTLBNL

401.35 MW generation in Callahan, TX · In queue since January 2020 · Proposed COD February 2026

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

401.35 MW

Capacity

1

Components

Solar

6y 10m

In Queue

IA Executed

IA Phase

Signed Jun 2023

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

3y 5m

IA → COD

2y 8m

Total Duration

3y 5m

Schedule

9 months past proposed COD

Construction75%
Queue EntryJan 9, 2020

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementJun 19, 2023

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2026-02-16

Queue history
22INR0261 · 64 monthly ERCOT reports, Aug 2020 – Mar 2026

Projected COD moved

3 times

Jan 2023 → Feb 2026

Net change

+37 months

first report to latest

Capacity

400 → 401 MW

changed in the reports

Latest stage

Commercial operation

last listed Mar 2026

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJan 9, 2020
Facilities study approvedMar 14, 2025
Interconnection agreement signedJun 19, 2023
Approved for energizationNov 6, 2025
Approved for synchronizationDec 1, 2025
Approved for commercial operationApr 28, 2026
On ERCOT's inactive listFeb 2022 – May 2022

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Feb 16, 2026
From queue filing
Developer in saved assessment
Enbridge Inc.
Filed as Enbridge Solar (Sequoia I), LLC
Status at research time
Construction
LBNL shows active with IA executed (2023-06-19). Enbridge reports Sequoia Solar construction under way in Callahan County, with phase 1 being finished and phase 2 site prep started, so Dorado is likely in construction or late-stage build.
Financing
Not recorded

Milestones in this assessment

GroundbreakingDec 2024

Enbridge held an official groundbreaking for the 815 MW Sequoia Solar Project in Callahan County, TX, per a Dec 4, 2024 Enbridge statement quoted in a social post.

facebook.com
COD targetFeb 16, 2026Latest in this assessment

ERCOT queue proposed commercial operation date for Dorado Solar (22INR0261).

infrasure.ai
Research sources and reasoning (4 recorded sources)

medium confidence at research time

  1. facebook.com/groups/erathcountystopsolarfarmshere/posts/1648914715818210/
  2. enbridge.com/projects-and-infrastructure/public-awareness/sequoia-solar-project
  3. infrasure.ai/project/ercot-22inr0261-dorado-solar
  4. cleanview.co/planned-solar-projects/texas/22INR0261/dorado-solar

Commercial operation date: LBNL's proposed COD of 2026-02-16 is consistent with Enbridge's Dec 2024 statement, quoted in a social post, that the Sequoia Solar Project would be fully operational 'in late 2025 to early 2026'. Cleanview and Infrasure only repeat the queue date, so they are not independent confirmation.

Developer: The LBNL filing entity 'Enbridge Solar (Sequoia I), LLC' is a project LLC of Enbridge Inc. Enbridge's Sequoia Solar Project page covers the same Callahan County, TX build. The match relies on the LLC name and county, not an explicit 'Dorado' reference.

Status: Enbridge held a groundbreaking in Callahan County in Dec 2024 and its project page describes phase 1 nearing completion. Dorado is probably one Sequoia phase (401 MW of the 815 MW total), but which phase is not confirmed.

About

Saved background

Generated Apr 10, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Dorado Solar is a proposed 401.35 MW solar generation project located in Callahan County, Texas. The developer is Enbridge Solar (Sequoia I), LLC. The project is in the ERCOT interconnection queue as entry ERCOT-22INR0261, with a queue entry date of January 9, 2020, and a proposed commercial operation date of February 16, 2026. The project's Interconnection Agreement (IA) was executed on June 19, 2023.

The Dorado Solar project has been the subject of recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
  • Queue history observations through: Mar 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Callahan

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Enbridge Solar (Sequoia I), LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

68051 Reata 345kV

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.