Dorado Solar
401.35 MW generation in Callahan, TX · In queue since January 2020 · Proposed COD February 2026
401.35 MW
Capacity
1
Components
Solar
6y 10m
In Queue
IA Executed
IA Phase
Signed Jun 2023
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
3y 5m
IA → COD
2y 8m
Total Duration
3y 5m
Schedule
9 months past proposed COD
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 12–24 months
Proposed COD: 2026-02-16
Projected COD moved
3 times
Jan 2023 → Feb 2026
Net change
+37 months
first report to latest
Capacity
400 → 401 MW
changed in the reports
Latest stage
Commercial operation
last listed Mar 2026
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Milestones in this assessment
Enbridge held an official groundbreaking for the 815 MW Sequoia Solar Project in Callahan County, TX, per a Dec 4, 2024 Enbridge statement quoted in a social post.
facebook.comERCOT queue proposed commercial operation date for Dorado Solar (22INR0261).
infrasure.aiResearch sources and reasoning (4 recorded sources)
medium confidence at research time
- facebook.com/groups/erathcountystopsolarfarmshere/posts/1648914715818210/
- enbridge.com/projects-and-infrastructure/public-awareness/sequoia-solar-project
- infrasure.ai/project/ercot-22inr0261-dorado-solar
- cleanview.co/planned-solar-projects/texas/22INR0261/dorado-solar
Commercial operation date: LBNL's proposed COD of 2026-02-16 is consistent with Enbridge's Dec 2024 statement, quoted in a social post, that the Sequoia Solar Project would be fully operational 'in late 2025 to early 2026'. Cleanview and Infrasure only repeat the queue date, so they are not independent confirmation.
Developer: The LBNL filing entity 'Enbridge Solar (Sequoia I), LLC' is a project LLC of Enbridge Inc. Enbridge's Sequoia Solar Project page covers the same Callahan County, TX build. The match relies on the LLC name and county, not an explicit 'Dorado' reference.
Status: Enbridge held a groundbreaking in Callahan County in Dec 2024 and its project page describes phase 1 nearing completion. Dorado is probably one Sequoia phase (401 MW of the 815 MW total), but which phase is not confirmed.
About
Generated Apr 10, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Dorado Solar is a proposed 401.35 MW solar generation project located in Callahan County, Texas. The developer is Enbridge Solar (Sequoia I), LLC. The project is in the ERCOT interconnection queue as entry ERCOT-22INR0261, with a queue entry date of January 9, 2020, and a proposed commercial operation date of February 16, 2026. The project's Interconnection Agreement (IA) was executed on June 19, 2023.
The Dorado Solar project has been the subject of recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
- Queue history observations through: Mar 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Callahan
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Enbridge Solar (Sequoia I), LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
68051 Reata 345kV
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
TOCE TX BESS 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Solar queue pipeline by status
Data tables and metrics from the InfraSure database.
Texas energy overview
Summary analysis with parallel narrative sections and visualizations.
State-by-state breakdown for ERCOT (Texas)
Summary analysis with parallel narrative sections and visualizations.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.