Sbranch Solar
233.52 MW generation in Wharton, TX · In queue since January 2019 · Proposed COD October 2026
233.52 MW
Capacity
1
Components
Solar
7y 10m
In Queue
IA Executed
IA Phase
Signed Jul 2020
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
1y 6m
IA → COD
6y 3m
Total Duration
1y 6m
Schedule
1 months past proposed COD
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
SS Completed, FIS Completed, IA
Project under construction
Typical: 12–24 months
Proposed COD: 2026-10-31
Projected COD moved
22 times
Jun 2021 → Oct 2026
Net change
+64 months
first report to latest
Capacity
175 → 234 MW
changed in the reports
Latest stage
Synchronized
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.
Milestones in this assessment
Expected commercial operation date per Texas PUC records
ftp.puc.texas.govResearch sources and reasoning (5 recorded sources)
high confidence at research time
- cleanview.co/power-projects/planned/solar-farms/texas/22INR0205/sbranch-solar-
- ercotqueue.com/project/22INR0205
- ftp.puc.texas.gov/public/puct-info/industry/electric/reports/genplant/gentable.xls
- ercot.com/files/docs/2024/07/01/meter_point_provisional-approved_2026_02_04_1656.pdf
- renewablesinfo.org/project/ercot-22inr0205-sbranch-solar
Commercial operation date: LBNL proposed COD is April 2026. Multiple independent sources (Texas PUC gentable.xls, Cleanview, ercotqueue.com) consistently report March 2026 as the expected online date. The 1-month difference represents minor refinement rather than major disagreement.
Developer: All sources consistently identify Bernard Creek Solar, LLC as the developer. No parent company or operating entity is mentioned in any search results, suggesting this may be the actual operating entity rather than a shell LLC.
Status: LBNL status of 'IA Executed' (July 2020) is confirmed. Ercotqueue.com shows project as 'Commissioned' with 100% build probability, and ERCOT meter point documentation from July 2024 shows provisional approval, indicating advanced development stage approaching COD.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Sbranch Solar is a proposed 233.52 MW solar generation project located in Wharton County, Texas. The project, developed by Bernard Creek Solar, LLC, is in the ERCOT interconnection queue as entry ERCOT-22INR0205, with a queue entry date of January 3, 2019. The proposed commercial operation date is March 31, 2026.
The project's Interconnection Agreement (IA) has been executed as of July 26, 2020. The point of interconnection (POI) is at the Tap 138kV 44190 East Bernard - 44130 Caney. The project is currently listed as active in the interconnection queue.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Wharton
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Bernard Creek Solar, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 138kV 44190 East Bernard - 44130 Caney
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_HOUSTON
- Hub Confidence
- MEDIUM
- POI Substation
- East Bernard Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Bernard Creek Solar
Data-driven briefing on Bernard Creek Solar — fleet, generation, financial, and news signals.
Solar queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Sbranch Solar
Data-driven briefing on Sbranch Solar — fleet, generation, financial, and news signals.
RP SCG Texas Solar
Summary analysis with parallel narrative sections and visualizations.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.