Delilah Solar 2 (ERCOT-22INR0203) — Project Summary

Queue ID
ERCOT-22INR0203
Capacity
317.58 MW
Technology
Solar
Status
active
Location
Lamar, TX
Region
ERCOT
Developer
Delilah Solar Energy II LLC
IA Status
IA Executed

Delilah Solar 2

ERCOT-22INR0203BetaActiveSolarERCOTLBNL + Live

317.58 MW generation in Lamar, TX · In queue since November 2018 · Proposed COD December 2026

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

317.58 MW

Capacity

1

Components

Solar

8 years

In Queue

IA Executed

IA Phase

Signed Dec 2020

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

2y 1m

IA → COD

6 years

Total Duration

2y 1m

Construction75%
Queue EntryNov 20, 2018

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementDec 22, 2020

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Completed, IA

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2026-12-31

Queue history
22INR0203 · 89 monthly ERCOT reports, May 2019 – Sep 2026

Projected COD moved

12 times

Dec 2022 → Dec 2026

Net change

+48 months

first report to latest

Capacity

400 → 318 MW

changed in the reports

Latest stage

Synchronized

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedNov 20, 2018
Facilities study approvedJun 9, 2020
Interconnection agreement signedDec 22, 2020
Approved for energizationOct 29, 2024
Approved for synchronizationJan 13, 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
2025
Differs from queue: Dec 31, 2026
Developer in saved assessment
WEC Energy Group
Ownership change in saved research
Status at research time
Online
LBNL still shows an active queue entry with IA executed. ercotqueue.com shows the project as commissioned, and ERCOT's Sept 2025 resource list includes Delilah Solar 2, so it appears to be in or near commercial operation.
Financing
Secured
WEC Energy Group acquisition/investment of about $459M, reported 2024-04-29. It is not confirmed that the full amount is attributable to Delilah Solar 2 alone.
Ownership history
  1. 2024-04·Delilah Solar Energy II LLC→WEC Energy Groupbizjournals.com

Milestones in this assessment

Ownership changeApr 29, 2024Latest in this assessment

WEC Energy Group reported to invest $459M in acquiring a solar project, linked to Delilah Solar 2.

bizjournals.com
Research sources and reasoning (4 recorded sources)

low confidence at research time

  1. bizjournals.com/milwaukee/news/2024/04/29/wec-energy-invests-459-million-in-solar-project.html
  2. ercotqueue.com/project/22INR0203
  3. ercot.com/files/docs/2025/09/02/Stand-Alone-Generation-Resources-as-of-09.01.25-v2.pdf
  4. infrasure.ai/project/ercot-22inr0203-delilah-solar-2

Commercial operation date: ercotqueue.com lists the project as 'Currently Commissioned', and ERCOT's 09.01.25 Stand-Alone Generation Resources list includes DELILAH SOLAR 2 (DELILA_2_G1, 107 MW). Together these suggest it was operating by about 2025, ahead of LBNL's 2026-12-31. Infrasure shows a May 2026 proposed COD, which also points earlier than LBNL. No source gives an exact COD date.

Developer: The news extraction (Business Journals, 2024-04-29) reports WEC Energy Group as buyer in a $459M solar acquisition linked to this project, while LBNL and ERCOT sources still show the Delilah Solar Energy II LLC shell. The article's text was not available to confirm the project name, and the original developer is not identified in the sources (the Invenergy/Verizon article does not name Delilah).

Status: ERCOT's own resource registry (Sept 2025) and ercotqueue's 'Commissioned' status indicate the project has moved past the queue stage. Other aggregators (Cleanview, Groundtrace) still call it planned or under construction, but those entries are undated and likely lag.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Delilah Solar 2 is a proposed solar generation project located in Lamar County, Texas, with a total capacity of 317.58 MW. The developer is Delilah Solar Energy II LLC. The project is in the ERCOT interconnection queue as entry ERCOT-22INR0203, with a queue entry date of November 20, 2018, and a proposed commercial operation date of May 30, 2026. The interconnection agreement (IA) has been executed as of December 22, 2020.

The Delilah Solar 2 project has been the subject of recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Lamar

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Delilah Solar Energy II LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

345 kV TTRSW 11688

Data Source

LBNL + Live

TransactionAcquisitionThe Business Journals · 2024-04-29
Deal value$459.0MThe Business Journals · 2024-04-29
OfftakerWEC Energy GroupThe Business Journals · 2024-04-29
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (1)Beta

Last updated 2026-03-26

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.