Blue Jay Solar II (ERCOT-21INR0538) — Project Summary

Queue ID
ERCOT-21INR0538
Capacity
68.95 MW
Technology
Solar
Status
active
Location
Grimes, TX
Region
ERCOT
Developer
Blue Jay Solar I, LLC
IA Status
IA Executed

Blue Jay Solar II

ERCOT-21INR0538BetaActiveSolarERCOTLBNL + Live

68.95 MW generation in Grimes, TX · In queue since April 2021 · Proposed COD October 2025

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

68.95 MW

Capacity

1

Components

Solar

5y 7m

In Queue

IA Executed

IA Phase

COD target: 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 6m

Schedule

13 months past proposed COD

Construction75%
Queue EntryApr 13, 2021

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Completed, IA

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2025-10-31

Queue history
21INR0538 · 66 monthly ERCOT reports, Apr 2021 – Sep 2026

Projected COD moved

22 times

Dec 2021 → Oct 2025

Net change

+46 months

first report to latest

Capacity

66 → 69 MW

changed in the reports

Latest stage

Synchronized

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedApr 13, 2021
Facilities study approvedApr 26, 2021
Interconnection agreement signedOct 26, 2020
Approved for energizationNov 11, 2021
Approved for synchronizationNov 19, 2021

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Blue Jay Solar II is a proposed solar generation project located in Grimes County, Texas, with a total capacity of 68.95 MW. The project, developed by Blue Jay Solar I, LLC, consists of 68.95 MW of solar photovoltaic generation. It is listed in the ERCOT interconnection queue as entry ERCOT-21INR0538, with a queue entry date of April 13, 2021, and a proposed commercial operation date of October 31, 2025. The project's Interconnection Agreement (IA) has been executed as of October 26, 2020.

The proposed project has been mentioned in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Grimes

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Blue Jay Solar I, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

4 Iola 138kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
MEDIUM
Nearest Node (Estimated)
BLUEJAY_RN
POI Substation
Iola Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (1)Beta

Last updated 2026-03-26

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.