Query
Blue Jay Solar I, LLC
Type
Entity Briefing
Entity
Blue Jay Solar I, LLC
Generated
2026-10-18T09:16:29.314Z

Briefing on Blue Jay Solar I, LLC

Entity Briefing
Generated Oct 18, 2026·Dataset freshness not reported
262 MW
Capacity
Operating
Current status
2023
Operating since
2
Generators
19.4%
Capacity factor
444 GWh
Annual generation
Briefing/plantOperating

Blue Jay Solar I, LLC is a 262 MW Batteries asset in ERCOT (Texas), currently Operating.

Blue Jay Solar I, LLC is reported in Texas since 2023 under Enel. Available operating and financial measures include 19.4% capacity factor and 444 GWh annual generation.

Location
Grimes, Texas
Technology
Batteries, Solar Photovoltaic
Owner / parent
Enel
Operator
Blue Jay Solar I, LLC
Grid
ERCOT (Texas)
Plant ID
64672

What stands out

1

Blue Jay Solar I, LLC is a 262 MW Batteries asset in Texas with status Operating.

2

Latest annual operating measures report 19.4% capacity factor and 444 GWh annual generation.

3

1 linked queue projects represent 141 MW of proposed capacity.

4

Latest linked story: “Renewable energy project cancellations spike in Texas: 'A canary in a coal mine'” (Houston Chronicle, 2025-06-09).

Market and operating context

ISO / market
ERCOT (Texas)
Balancing authority
Electric Reliability Council of Texas, Inc.
NERC region
TRE
State rank
#80 of 378
National rank
#197 of 7,971

Why it matters

For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.