McClure Solar (ERCOT-21INR0509) — Project Summary

Queue ID
ERCOT-21INR0509
Capacity
105.73 MW
Technology
Solar
Status
active
Location
Palo Pinto, TX
Region
ERCOT
Developer
McClure Solar LLC
IA Status
Facility Study

McClure Solar

ERCOT-21INR0509BetaActiveSolarERCOTLBNL + Live

105.73 MW generation in Palo Pinto, TX · In queue since June 2020 · Proposed COD December 2025

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

105.73 MW

Capacity

1

Components

Solar

6y 5m

In Queue

Facility Study

IA Phase

COD target: 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

5y 6m

Schedule

11 months past proposed COD

Facilities Study50%
Queue EntryJun 3, 2020

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2025-12-31

Queue history
21INR0509 · 66 monthly ERCOT reports, Mar 2021 – Sep 2026

Projected COD moved

4 times

Dec 2022 → Dec 2025

Net change

+36 months

first report to latest

Capacity

50 → 106 MW

changed in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJun 3, 2020
On ERCOT's inactive listNov 2022 – Nov 2022

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

News-reported activity
as of 5y 8m ago

From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.

Project statusOperationalBurlington Free Press · 2021-03-23

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Dec 31, 2025
From queue filing
Developer in saved assessment
Belltown Power Texas
Filed as McClure Solar LLC
Status at research time
Active
Active — Facility Study stage per LBNL queue. County presentation occurred August 2022; no subsequent construction or financing announcements found.
Financing
Not recorded

Milestones in this assessment

Permit approvedAug 2022Latest in this assessment

Belltown Power Texas presented McClure Solar Project to Palo Pinto County Commissioners Court

co.palo-pinto.tx.us
Research sources and reasoning (3 recorded sources)

low confidence at research time

  1. co.palo-pinto.tx.us/upload/page/0125/CC08082022.pdf
  2. cleanview.co/power-projects/planned/solar-farms/texas/21INR0509/mcclure-solar
  3. ercotqueue.com/project/21INR0509

Commercial operation date: LBNL proposes 2025-12-31 COD. Cleanview aggregator sites echo this date but provide no independent verification. No press releases, financing announcements, or construction updates found to validate or contradict this target.

Developer: LBNL filing entity is 'McClure Solar LLC' (project shell). Palo Pinto County meeting minutes from August 2022 identify 'Belltown Power Texas' as the presenting entity for the McClure Solar Project, indicating Belltown is the operating developer behind the LLC.

Status: LBNL status is 'active' at Facility Study stage (no IA executed). County records confirm developer engagement in 2022, but absence of recent news suggests project remains in early development with no visible momentum toward construction.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The McClure Solar project is a proposed 105.73 MW solar generation facility in Palo Pinto County, Texas. The project, developed by McClure Solar LLC, is interconnected within the ERCOT region under queue ID ERCOT-21INR0509. It entered the interconnection queue on June 3, 2020, and has a proposed commercial operation date of December 31, 2025. Its interconnection status is currently in the Facility Study phase.

The proposed project consists of 105.73 MW of solar capacity. The point of interconnection is at the tap 69kV 785 Oran - 343 Morris Sheppard. The McClure Solar project has been mentioned in recent news coverage related to the energy industry.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Palo Pinto

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

McClure Solar LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

tap 69kV 785 Oran - 343 Morris Sheppard

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (1)Beta

Last updated 2026-03-26