McClure Solar is a 106 MW Solar project in Texas, currently active.
McClure Solar LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2025-12-31.
- Queue ID
- ERCOT-21INR0509
- Location
- Palo Pinto, Texas
- Technology
- Solar
- Developer
- McClure Solar LLC
- Market / region
- ERCOT
- Point of interconnection
- tap 69kV 785 Oran - 343 Morris Sheppard
What stands out
McClure Solar is a 106 MW Solar project in Texas with status active.
McClure Solar LLC is the reported developer.
The reported queue phase is Facility Study; proposed COD is 2025-12-31.
Latest linked story: “'A model for us to repeat': 'Microgrid' in Panton promises to keep the lights on using solar” (Burlington Free Press, 2021-03-23).
Market and operating context
- Queue date
- 2020-06-03
- Proposed COD
- 2025-12-31
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.