Query
McClure Solar
Type
Entity Briefing
Entity
McClure Solar
Generated
2026-10-19T16:29:31.966Z

Briefing on McClure Solar

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
106 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2025-12-31
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

McClure Solar is a 106 MW Solar project in Texas, currently active.

McClure Solar LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2025-12-31.

Queue ID
ERCOT-21INR0509
Location
Palo Pinto, Texas
Technology
Solar
Developer
McClure Solar LLC
Market / region
ERCOT
Point of interconnection
tap 69kV 785 Oran - 343 Morris Sheppard

What stands out

1

McClure Solar is a 106 MW Solar project in Texas with status active.

2

McClure Solar LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2025-12-31.

4

Latest linked story: “'A model for us to repeat': 'Microgrid' in Panton promises to keep the lights on using solar” (Burlington Free Press, 2021-03-23).

Market and operating context

Queue date
2020-06-03
Proposed COD
2025-12-31
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

McClure Solar — verified asset snapshot

FieldValue
Queue IDERCOT-21INR0509
LocationPalo Pinto, Texas
TechnologySolar
DeveloperMcClure Solar LLC
Market / regionERCOT
Point of interconnectiontap 69kV 785 Oran - 343 Morris Sheppard
Queue date2020-06-03
Proposed COD2025-12-31