Ramsey Storage (ERCOT-21INR0505) — Project Summary

Queue ID
ERCOT-21INR0505
Capacity
201.1 MW
Technology
Battery
Status
active
Location
Wharton, TX
Region
ERCOT
Developer
Hecate Energy Ramsey Storage LLC
IA Status
IA Executed

Ramsey Storage

ERCOT-21INR0505BetaActiveBatteryERCOTLBNL + Live

201.1 MW storage in Wharton, TX · In queue since May 2020 · Proposed COD June 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

201.1 MW

Capacity

1

Components

Battery

6y 6m

In Queue

IA Executed

IA Phase

Signed Aug 2022

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

2y 3m

IA → COD

5y 10m

Total Duration

2y 3m

Construction75%
Queue EntryMay 20, 2020

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementAug 11, 2022

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Started, IA

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2028-06-30

Queue history
21INR0505 · 69 monthly ERCOT reports, Jan 2021 – Sep 2026

Projected COD moved

8 times

May 2022 → Jun 2028

Net change

+73 months

first report to latest

Capacity

500 MW

unchanged in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedMay 20, 2020
Facilities study approvedFeb 25, 2022
Interconnection agreement signedAug 11, 2022

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
2028
From queue filing
Developer in saved assessment
Hecate Energy
Filed as Hecate Energy Ramsey Storage LLC
Status at research time
Active
Active — IA executed Aug 2022, project appears in EIA 2024 pipeline reports as planned 500 MW facility
Financing
Not recorded

Milestones in this assessment

IA executedAug 11, 2022Latest in this assessment

Interconnection Agreement executed with ERCOT

eia.gov
Research sources and reasoning (3 recorded sources)

medium confidence at research time

  1. eia.gov/todayinenergy/detail.php?id=61202&lv=true
  2. firetrace.com/fire-protection-blog/us-battery-storage-capacity-expected-to-double-in-2024
  3. renewablesinfo.org/plant/66414

Commercial operation date: LBNL queue snapshot shows proposed COD of 2028-06-30. No news sources provide an updated or conflicting COD target. EIA reports from Jan 2024 mention the project as planned but do not specify timing.

Developer: LBNL filing entity is 'Hecate Energy Ramsey Storage LLC' (project-specific LLC). Multiple sources reference 'Hecate Energy' as the developer/parent company. This follows standard practice of using project LLCs for interconnection filings.

Status: LBNL shows 'active' status with IA executed in Aug 2022. EIA Jan 2024 report lists project in pipeline. No withdrawal or cancellation signals found.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Ramsey Storage project is a proposed 510.4 MW battery storage project located in Wharton County, Texas. The developer is Hecate Energy Ramsey Storage LLC. It is interconnected within the ERCOT region under queue ID ERCOT-21INR0505, with a queue entry date of May 20, 2020, and a proposed commercial operation date of December 31, 2027. The project's Interconnection Agreement (IA) was executed on August 11, 2022.

The project is linked to the existing Hecate Energy Ramsey Storage operating plant (EIA ID 66414). The Ramsey Storage project has been mentioned in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Wharton

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Hecate Energy Ramsey Storage LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

44200 Hillje 345kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_HOUSTON
Hub Confidence
MEDIUM
POI Substation
Hillje Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.