Pearl Crescent Storage (ERCOT-21INR0470) — Project Summary

Queue ID
ERCOT-21INR0470
Capacity
50.26 MW
Technology
Solar+Battery
Status
withdrawn
Location
Colorado, TX
Region
ERCOT
Developer
RWE Solar Development, LLC
IA Status
Facility Study

Pearl Crescent Storage

ERCOT-21INR0470BetaWithdrawnBatteryBatteryERCOTLBNL + Live

50.26 MW generation in Colorado, TX · In queue since December 2019 · Proposed COD December 2026

Withdrawn from the ERCOT queue in September 2026, according to ERCOT's queue (Oct 2026).

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

50.26 MW

Capacity

1

Components

Battery

6y 11m

In Queue

Facility Study

IA Phase

COD target: 2026

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

7 years

Queue EntryDec 20, 2019

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Commercial Operation

Proposed COD: 2026-12-15

WithdrawnWithdrawn

Project withdrew from interconnection queue

Queue history
21INR0470 · 77 monthly ERCOT reports, Apr 2020 – Aug 2026

Projected COD moved

4 times

Jun 2021 → Dec 2026

Net change

+66 months

first report to latest

Capacity

50 → 50 MW

changed in the reports

Latest stage

Cancelled

last listed Aug 2026

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedDec 20, 2019
CancelledSep 14, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Pearl Crescent Storage is a proposed 50.26 MW battery storage project in Colorado County, Texas. Developed by RWE Solar Development, LLC, the project consists entirely of battery storage. It is currently active in the ERCOT interconnection queue as entry ERCOT-21INR0470, with a queue entry date of December 20, 2019, and a proposed commercial operation date of December 15, 2026. The project's interconnection status is currently in the Facility Study phase, and its point of interconnection is the Rock Island (57640) 138kV substation.

The proposed project is located within the Electric Reliability Council of Texas (ERCOT) service area. Recent news coverage has discussed the development of battery storage projects in Texas, including those within the ERCOT region.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Aug 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Colorado

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

RWE Solar Development, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Rock Island (57640) 138kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.