Query
Pearl Crescent Storage
Type
Entity Briefing
Entity
Pearl Crescent Storage
Generated
2026-10-19T13:06:41.675Z

Briefing on Pearl Crescent Storage

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
50 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2026-12-15
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Pearl Crescent Storage is a 50 MW Solar+Battery project in Texas, currently active.

RWE Solar Development, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2026-12-15.

Queue ID
ERCOT-21INR0470
Location
Colorado, Texas
Technology
Solar+Battery
Developer
RWE Solar Development, LLC
Market / region
ERCOT
Point of interconnection
Rock Island (57640) 138kV

What stands out

1

Pearl Crescent Storage is a 50 MW Solar+Battery project in Texas with status active.

2

RWE Solar Development, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2026-12-15.

Market and operating context

Queue date
2019-12-20
Proposed COD
2026-12-15
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Pearl Crescent Storage — verified asset snapshot

FieldValue
Queue IDERCOT-21INR0470
LocationColorado, Texas
TechnologySolar+Battery
DeveloperRWE Solar Development, LLC
Market / regionERCOT
Point of interconnectionRock Island (57640) 138kV
Queue date2019-12-20
Proposed COD2026-12-15