Big Star Storage (ERCOT-21INR0469) — Project Summary

Queue ID
ERCOT-21INR0469
Capacity
80 MW
Technology
Battery
Status
active
Location
Bastrop, TX
Region
ERCOT
Developer
RWE Solar Development, LLC
IA Status
IA Executed

Big Star Storage

ERCOT-21INR0469BetaActiveBatteryERCOTLBNL

80 MW storage in Bastrop, TX · In queue since January 2020 · Proposed COD January 2026

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

80 MW

Capacity

1

Components

Battery

6y 10m

In Queue

IA Executed

IA Phase

Signed Oct 2020

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

9 months

IA → COD

5y 3m

Total Duration

9 months

Schedule

10 months past proposed COD

Construction75%
Queue EntryJan 2, 2020

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementOct 2, 2020

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2026-01-31

Queue history
21INR0469 · 73 monthly ERCOT reports, Aug 2020 – Aug 2026

Projected COD moved

15 times

Apr 2022 → Sep 2026

Net change

+53 months

first report to latest

Capacity

90 → 80 MW

changed in the reports

Latest stage

Commercial operation

last listed Aug 2026

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJan 2, 2020
Facilities study approvedJul 19, 2021
Interconnection agreement signedOct 2, 2020
Approved for energizationApr 13, 2023
Approved for synchronizationNov 6, 2023
Approved for commercial operationSep 25, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

News-reported activity
as of 2 years ago

From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.

Project statusOperationalPower Engineering · 2024-11-08

About

Saved background

Generated Apr 10, 2026 · Predates Aug 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Big Star Storage is a proposed 80 MW battery storage project in Bastrop County, Texas, being developed by RWE Solar Development, LLC. The project is interconnected within the ERCOT queue as entry ERCOT-21INR0469, with a queue entry date of January 2, 2020, and a proposed commercial operation date of January 31, 2026. The project's Interconnection Agreement (IA) was executed on October 2, 2020.

The development has been mentioned in recent news coverage related to grid infrastructure.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
  • Queue history observations through: Aug 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Bastrop

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

RWE Solar Development, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345kV 9074 Lytton - 9073 Holman

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
HIGH
Nearest Node (Estimated)
BIGSTAR_ALL

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (1)Beta

Last updated 2026-03-26

View all articles