Big Star Storage is a 80 MW Battery project in Texas, currently active.
RWE Solar Development, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2026-01-31.
- Queue ID
- ERCOT-21INR0469
- Location
- Bastrop, Texas
- Technology
- Battery
- Developer
- RWE Solar Development, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 345kV 9074 Lytton - 9073 Holman
What stands out
Big Star Storage is a 80 MW Battery project in Texas with status active.
RWE Solar Development, LLC is the reported developer.
The reported queue phase is IA Executed; proposed COD is 2026-01-31.
Latest linked story: “Texas continues to break battery energy storage records” (Power Engineering, 2024-11-08).
Market and operating context
- Queue date
- 2020-01-02
- Proposed COD
- 2026-01-31
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.