Knickerbocker Storage (ERCOT-21INR0446) — Project Summary

Queue ID
ERCOT-21INR0446
Capacity
25 MW
Technology
Other
Status
suspended
Location
Tom Green, TX
Region
ERCOT
Developer
Knickerbocker Solar LLC
IA Status
Facility Study

Knickerbocker Storage

ERCOT-21INR0446BetaSuspendedOtherERCOTLBNL

25 MW generation in Tom Green, TX · In queue since December 2019 · Proposed COD June 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

25 MW

Capacity

1

Components

Other

6y 11m

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

8y 6m

Suspended50%
Queue EntryDec 18, 2019

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-06-01

Queue history
21INR0446 · 67 monthly ERCOT reports, Dec 2019 – Aug 2025

Projected COD moved

5 times

Dec 2021 → Jun 2028

Net change

+78 months

first report to latest

Capacity

25 → 0 MW

changed in the reports

Latest stage

Cancelled

last listed Aug 2025

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedDec 19, 2019
CancelledSep 16, 2025
On ERCOT's inactive listSep 2021 – Oct 2021

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Knickerbocker Storage (queue ID ERCOT-21INR0446) is a proposed 25 MW generation development project in Tom Green County, Texas, within the Electric Reliability Council of Texas (ERCOT) region. The project is being developed by Knickerbocker Solar LLC. Its technology is classified in the interconnection queue as "Other," with a single 25 MW component of that type. The project's proposed point of interconnection is a tap on the 345 kV transmission line between the Big Hill (76003) and Twin Buttes (76009) substations.

The project entered the ERCOT interconnection queue on December 18, 2019. Its interconnection process is at the Facility Study stage, and its queue status is listed as suspended. The developer has proposed a commercial operation date of June 1, 2028.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
  • Queue history observations through: Aug 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Tom Green

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Knickerbocker Solar LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345kV 76003 Big Hill - 76009 Twin Buttes

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
POI Substation
Big Hill Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.