Holstein 2 Energy Storage (ERCOT-21INR0430) — Project Summary

Queue ID
ERCOT-21INR0430
Capacity
102.42 MW
Technology
Solar+Battery
Status
active
Location
Nolan, TX
Region
ERCOT
Developer
229HD 8me LLC
IA Status
Facility Study

Holstein 2 Energy Storage

ERCOT-21INR0430BetaActiveBatteryBatteryERCOTLBNL

102.42 MW generation in Nolan, TX · In queue since August 2019 · Proposed COD May 2027

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

102.42 MW

Capacity

1

Components

Battery

7y 3m

In Queue

Facility Study

IA Phase

COD target: 2027

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

7y 9m

Facilities Study50%
Queue EntryAug 26, 2019

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-05-01

Queue history
21INR0430 · 68 monthly ERCOT reports, Aug 2019 – Apr 2026

Projected COD moved

9 times

Jun 2021 → May 2027

Net change

+71 months

first report to latest

Capacity

100 → 102 MW

changed in the reports

Latest stage

Cancelled

last listed Apr 2026

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedAug 26, 2019
CancelledMay 11, 2026
On ERCOT's inactive listMar 2024 – Jun 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
May 2027
From queue filing
Developer in saved assessment
Duke Energy Renewables
Ownership change in saved research
Status at research time
Active
Active — Facility Study stage, part of Duke's Holstein solar+storage development in Nolan County
Financing
Not recorded
Ownership history
  1. 2019-07·8minute Solar Energy→Duke Energy Renewablesnews.duke-energy.com

Milestones in this assessment

Ownership changeJul 2019Latest in this assessment

Duke Energy Renewables acquired 200 MW Holstein solar project from 8minute Solar Energy

news.duke-energy.com
Research sources and reasoning (3 recorded sources)

medium confidence at research time

  1. news.duke-energy.com/releases/duke-energy-renewables-acquires-200-mw-holstein-solar-project-in-texas-from-8minute-solar-energy
  2. pv-magazine-usa.com/2019/07/23/duke-buys-a-200-mw-merchant-solar-project-in-texas/
  3. cleanview.co/planned-battery-projects/TX/21INR0430/holstein-2-energy-storage

Commercial operation date: LBNL queue snapshot shows proposed COD of May 2027. No independent news sources provide alternative dates. Cleanview aggregator confirms 'expected online April 2027' which aligns with LBNL data.

Developer: LBNL filing entity is '229HD 8me LLC', a project shell. Duke Energy press release (July 2019) confirms Duke acquired the 200 MW Holstein solar project from 8minute Solar Energy in Nolan County, TX. Holstein 2 appears to be the associated storage component of this larger Holstein development.

Status: LBNL status shows 'active' at Facility Study stage. No news indicates withdrawal, cancellation, or construction start. Project remains in interconnection queue progression.

About

Saved background

Generated Apr 10, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Holstein 2 Energy Storage is a proposed 102.42 MW battery storage project in Nolan County, Texas. The developer is 229HD 8me LLC. The project is interconnected to the ERCOT grid under queue ID ERCOT-21INR0430, with an interconnection queue entry date of August 26, 2019, and a proposed commercial operation date of May 1, 2027. Its interconnection agreement status is currently in the Facility Study phase. The project is linked to the existing Holstein 2 Battery Storage operating plant (EIA plant ID 67896).

The Holstein 2 Energy Storage project has been the subject of recent news coverage, with three articles categorized as regulatory and industry news.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
  • Queue history observations through: Apr 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Nolan

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

229HD 8me LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

11406 Central Bluff 345kV

Data Source

LBNL

AgencyTexas LegislatureTrellis Group · 2025-06-12
RulingFinal ruleTrellis Group · 2025-06-12
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
Nearest Node (Estimated)
HOLSTEIN_ALL

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (1)Beta

Last updated 2026-03-26

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.