Holstein 2 Energy Storage is a 102 MW Solar+Battery project in Texas, currently active.
229HD 8me LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-05-01.
- Queue ID
- ERCOT-21INR0430
- Location
- Nolan, Texas
- Technology
- Solar+Battery
- Developer
- 229HD 8me LLC
- Market / region
- ERCOT
- Point of interconnection
- 11406 Central Bluff 345kV
What stands out
Holstein 2 Energy Storage is a 102 MW Solar+Battery project in Texas with status active.
229HD 8me LLC is the reported developer.
The reported queue phase is Facility Study; proposed COD is 2027-05-01.
Latest linked story: “New Texas law threatens viability of battery energy storage systems” (Trellis Group, 2025-06-12).
Market and operating context
- Queue date
- 2019-08-26
- Proposed COD
- 2027-05-01
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.