Crowded Star Solar (ERCOT-20INR0241) — Project Summary

Queue ID
ERCOT-20INR0241
Capacity
218.79 MW
Technology
Solar+Battery
Status
active
Location
Jones, TX
Region
ERCOT
Developer
Jones City Solar, LLC
IA Status
IA Executed

Crowded Star Solar

ERCOT-20INR0241BetaActiveSolarBatteryERCOTLBNL + Live

218.79 MW hybrid in Jones, TX · In queue since January 2019 · Proposed COD August 2026

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

218.79 MW

Capacity

1

Components

Solar

7y 10m

In Queue

IA Executed

IA Phase

Signed Jul 2023

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

4y 6m

IA → COD

3y 1m

Total Duration

4y 6m

Schedule

3 months past proposed COD

Construction75%
Queue EntryJan 21, 2019

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementJul 27, 2023

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Completed, IA

Project under construction

Typical: 18–30 months

Commercial Operation

Proposed COD: 2026-08-17

Queue history
20INR0241 · 88 monthly ERCOT reports, May 2019 – Sep 2026

Projected COD moved

13 times

Jul 2021 → Aug 2026

Net change

+61 months

first report to latest

Capacity

400 → 219 MW

changed in the reports

Latest stage

Synchronized

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJan 21, 2019
Facilities study approvedNov 5, 2024
Interconnection agreement signedDec 17, 2019
Approved for energizationApr 22, 2026
Approved for synchronizationMay 28, 2026
On ERCOT's inactive listAug 2021 – Aug 2021

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Aug 2026
From queue filing
Developer in saved assessment
Jones City Solar, LLC
From queue filing
Status at research time
Active
Active — IA executed July 2023, Phase I project with companion Phase II (22INR0274) also in queue, both targeting 2026 COD
Financing
Not recorded

Milestones in this assessment

IA executedJul 27, 2023

Interconnection Agreement executed with ERCOT

interconnection.fyi
COD targetAug 2026Latest in this assessment

Expected online date August 2026 per LBNL filing and third-party tracking

cleanview.co
Research sources and reasoning (4 recorded sources)

medium confidence at research time

  1. interconnection.fyi/project/ercot-20inr0241
  2. cleanview.co/power-projects/planned/solar-farms/texas/20INR0241/crowded-star-solar
  3. ercotqueue.com/developer/jones-city-solar-ii-llc
  4. interchange.puc.texas.gov/search/filings/?UtilityType=E&ControlNumber=35077&DocumentType=ALL&SortBy=ItemNumber&SortOrder=Descending

Commercial operation date: LBNL proposed COD of 2026-08-17 aligns with multiple third-party sources (Cleanview, ERCOT data) showing 2026 expected online date. No contradictory recent announcements found.

Developer: Only LBNL filing entity 'Jones City Solar, LLC' is available. No press releases or corporate announcements found identifying a parent operating company. The entity appears to be the actual developer rather than a shell LLC based on consistent usage across ERCOT filings and related Phase II project.

Status: LBNL status 'active' with IA executed 2023-07-27 is confirmed by ERCOT queue data showing 'IA + FIS complete' status. No withdrawal or construction announcements found.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Crowded Star Solar project is a proposed 218.79 MW solar generation facility in Jones County, Texas. The project, developed by Jones City Solar, LLC, is interconnected within the ERCOT region under queue ID ERCOT-20INR0241. It entered the interconnection queue on January 21, 2019, and has a proposed commercial operation date of July 8, 2026.

The project's Interconnection Agreement (IA) was executed on December 17, 2019. Recent news coverage indicates industry interest in the development.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Jones

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Jones City Solar, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

tap 345kV 68001 Claytonville – 68004 Phantom Hill c2 (New Substation: Open Sky 68014)

Data Source

LBNL + Live

ApplicantXcel EnergyKFDA | NewsChannel 10 · 2025-10-07
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (1)Beta

Last updated 2026-04-09

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.