Crowded Star Solar
Type
Entity Briefing
Entity
Crowded Star Solar
Generated
2026-10-19T21:22:41.955Z

Briefing on Crowded Star Solar

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
219 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2026-08-17
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Crowded Star Solar is a 219 MW Solar+Battery project in Texas, currently active.

Jones City Solar, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2026-08-17.

Queue ID
ERCOT-20INR0241
Location
Jones, Texas
Technology
Solar+Battery
Developer
Jones City Solar, LLC
Market / region
ERCOT
Point of interconnection
tap 345kV 68001 Claytonville – 68004 Phantom Hill c2 (New Substation: Open Sky 68014)

What stands out

1

Crowded Star Solar is a 219 MW Solar+Battery project in Texas with status active.

2

Jones City Solar, LLC is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2026-08-17.

4

Latest linked story: “‘We don’t want it’: Potter County residents pack meeting to oppose proposed Xcel solar farm” (KFDA | NewsChannel 10, 2025-10-07).

Market and operating context

Queue date
2019-01-21
Proposed COD
2026-08-17
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Crowded Star Solar — verified asset snapshot

FieldValue
Queue IDERCOT-20INR0241
LocationJones, Texas
TechnologySolar+Battery
DeveloperJones City Solar, LLC
Market / regionERCOT
Point of interconnectiontap 345kV 68001 Claytonville – 68004 Phantom Hill c2 (New Substation: Open Sky 68014)
Queue date2019-01-21
Proposed COD2026-08-17