Crowded Star Solar is a 219 MW Solar+Battery project in Texas, currently active.
Jones City Solar, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2026-08-17.
- Queue ID
- ERCOT-20INR0241
- Location
- Jones, Texas
- Technology
- Solar+Battery
- Developer
- Jones City Solar, LLC
- Market / region
- ERCOT
- Point of interconnection
- tap 345kV 68001 Claytonville – 68004 Phantom Hill c2 (New Substation: Open Sky 68014)
What stands out
Crowded Star Solar is a 219 MW Solar+Battery project in Texas with status active.
Jones City Solar, LLC is the reported developer.
The reported queue phase is IA Executed; proposed COD is 2026-08-17.
Latest linked story: “‘We don’t want it’: Potter County residents pack meeting to oppose proposed Xcel solar farm” (KFDA | NewsChannel 10, 2025-10-07).
Market and operating context
- Queue date
- 2019-01-21
- Proposed COD
- 2026-08-17
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.