Horseshoe Bend Solar (ERCOT-19INR0075) — Project Summary

Queue ID
ERCOT-19INR0075
Capacity
301.1 MW
Technology
Solar
Status
active
Location
Brown, TX
Region
ERCOT
Developer
Clenera
IA Status
Facility Study

Horseshoe Bend Solar

ERCOT-19INR0075BetaActiveSolarERCOTLBNL + Live

301.1 MW generation in Brown, TX · In queue since June 2017 · Proposed COD February 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

301.1 MW

Capacity

1

Components

Solar

9y 5m

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

10y 8m

Facilities Study50%
Queue EntryJun 23, 2017

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-02-20

Queue history
19INR0075 · 94 monthly ERCOT reports, Dec 2018 – Sep 2026

Projected COD moved

9 times

Dec 2020 → Feb 2028

Net change

+86 months

first report to latest

Capacity

300 → 301 MW

changed in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJun 23, 2017

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Feb 20, 2028
From queue filing
Developer in saved assessment
Clenera
Sources agreed at research time
Status at research time
Active
Active in the ERCOT queue at the Facility Study stage with no executed IA; ercotqueue.com rates build-chance at about 13%. No construction or financing news was found.
Financing
Not recorded
Research sources and reasoning (5 recorded sources)

low confidence at research time

  1. infrasure.ai/project/ercot-19inr0075-horseshoe-bend-solar
  2. interconnection.fyi/project/ercot-19inr0075
  3. ercotqueue.com/project/19INR0075
  4. cleanview.co/power-projects/planned/solar-farms/texas/19INR0075/horseshoe-bend-solar
  5. sec.gov/Archives/edgar/data/1922641/000117891326001828/exhibit_8-1.htm

Commercial operation date: No developer, press-release or news signal gives a COD. interconnection.fyi repeats the LBNL date (February 20, 2028) and cleanview says 'Expected online 2028'. infrasure.ai shows 2027-02-20, but that is a derived queue-data page, not an independent financing-backed target, so LBNL's 2028 date stands.

Developer: LBNL, ercotqueue.com, interconnection.fyi and infrasure.ai all name Clenera. SEC subsidiary lists include 'Horseshoe Bend Solar LLC' alongside Clenera Holdings/DevCo entities, which confirms the project sits in the Clenera group. They do not show an ownership change specific to this project.

Status: LBNL shows active status and the Facility Study phase, and infrasure.ai and ercotqueue.com ('No IA') agree. One aggregator (interxdata) lists the project as 'operational', which contradicts every other source and is disregarded.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Horseshoe Bend Solar is a proposed 301.1 MW solar generation project located in Brown County, Texas. The project, developed by Clenera, is in the ERCOT interconnection queue as entry ERCOT-19INR0075, with a queue entry date of June 23, 2017. Its proposed commercial operation date is February 20, 2027, and its interconnection status is currently in the Facility Study phase.

The Horseshoe Bend Solar project has been the subject of recent news coverage, with three articles categorized as relating to deals and industry developments.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Brown

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Clenera

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

1444 Brown 345kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
MEDIUM
Nearest Node (Estimated)
BBSES_UNIT1
POI Substation
Big Brown Station

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.