Holstein 2 Solar
100.7 MW hybrid in Nolan, TX · In queue since December 2016 · Proposed COD April 2028
100.7 MW
Capacity
1
Components
Solar
9y 11m
In Queue
Facility Study
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
11y 4m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-04-03
Projected COD moved
11 times
Apr 2020 → Apr 2028
Net change
+96 months
first report to latest
Capacity
100 → 101 MW
changed in the reports
Latest stage
Cancelled
last listed Apr 2026
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
- 2019-07·8minute Solar Energy (229HD 8me LLC)→Duke Energy Renewablesnews.duke-energy.com
Milestones in this assessment
Duke Energy Renewables acquired 200-MW Holstein solar project from 8minute Solar Energy in Nolan County, Texas
news.duke-energy.comResearch sources and reasoning (4 recorded sources)
medium confidence at research time
- news.duke-energy.com/releases/duke-energy-renewables-acquires-200-mw-holstein-solar-project-in-texas-from-8minute-solar-energy
- pv-magazine-usa.com/2019/07/23/duke-buys-a-200-mw-merchant-solar-project-in-texas/
- ercot.com/files/docs/2018/06/01/GIS_REPORT__May_2018.xlsx
- interconnection.fyi/project/ercot-19inr0026
Commercial operation date: Only LBNL provides a COD target (2028-04-03). No news sources mention construction timeline or updated COD. Project remains in early Facility Study phase.
Developer: LBNL filing entity '229HD 8me LLC' is an 8minute Solar Energy shell LLC. Duke Energy acquired the 200-MW Holstein project from 8minute in July 2019 per Duke press release. Holstein 2 appears to be part of this acquisition.
Status: LBNL shows 'active' status in Facility Study. No news of construction start, permitting, or financing. Project appears to be in early development stage post-acquisition.
About
Generated Apr 10, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Holstein 2 Solar is a proposed 101.7 MW solar generation project located in Nolan County, Texas. The developer is 229HD 8me LLC. The project is in the ERCOT interconnection queue as entry ERCOT-19INR0026, with a queue entry date of December 21, 2016, and a proposed commercial operation date of April 3, 2028. Its interconnection agreement status is currently Facility Study.
The Holstein 2 Solar project has been mentioned in recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
- Queue history observations through: Apr 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Nolan
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
229HD 8me LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
11406 Central Bluff 345kV
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_WEST
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- HOLSTEIN_ALL
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-26
View all articlesForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.