Holstein 2 Solar (ERCOT-19INR0026) — Project Summary

Queue ID
ERCOT-19INR0026
Capacity
100.7 MW
Technology
Solar+Battery
Status
active
Location
Nolan, TX
Region
ERCOT
Developer
229HD 8me LLC
IA Status
Facility Study

Holstein 2 Solar

ERCOT-19INR0026BetaActiveSolarBatteryERCOTLBNL

100.7 MW hybrid in Nolan, TX · In queue since December 2016 · Proposed COD April 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

100.7 MW

Capacity

1

Components

Solar

9y 11m

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

11y 4m

Facilities Study50%
Queue EntryDec 21, 2016

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-04-03

Queue history
19INR0026 · 77 monthly ERCOT reports, Dec 2018 – Apr 2026

Projected COD moved

11 times

Apr 2020 → Apr 2028

Net change

+96 months

first report to latest

Capacity

100 → 101 MW

changed in the reports

Latest stage

Cancelled

last listed Apr 2026

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedDec 21, 2016
Facilities study approvedJun 28, 2021
CancelledMay 11, 2026
On ERCOT's inactive listSep 2020 – Dec 2024

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
2028
From queue filing
Developer in saved assessment
Duke Energy Renewables
Ownership change in saved research
Status at research time
Active
Active — in Facility Study phase, no construction announced. Part of Duke's Holstein project portfolio acquired in 2019.
Financing
Not recorded
Ownership history
  1. 2019-07·8minute Solar Energy (229HD 8me LLC)→Duke Energy Renewablesnews.duke-energy.com

Milestones in this assessment

Ownership changeJul 22, 2019Latest in this assessment

Duke Energy Renewables acquired 200-MW Holstein solar project from 8minute Solar Energy in Nolan County, Texas

news.duke-energy.com
Research sources and reasoning (4 recorded sources)

medium confidence at research time

  1. news.duke-energy.com/releases/duke-energy-renewables-acquires-200-mw-holstein-solar-project-in-texas-from-8minute-solar-energy
  2. pv-magazine-usa.com/2019/07/23/duke-buys-a-200-mw-merchant-solar-project-in-texas/
  3. ercot.com/files/docs/2018/06/01/GIS_REPORT__May_2018.xlsx
  4. interconnection.fyi/project/ercot-19inr0026

Commercial operation date: Only LBNL provides a COD target (2028-04-03). No news sources mention construction timeline or updated COD. Project remains in early Facility Study phase.

Developer: LBNL filing entity '229HD 8me LLC' is an 8minute Solar Energy shell LLC. Duke Energy acquired the 200-MW Holstein project from 8minute in July 2019 per Duke press release. Holstein 2 appears to be part of this acquisition.

Status: LBNL shows 'active' status in Facility Study. No news of construction start, permitting, or financing. Project appears to be in early development stage post-acquisition.

About

Saved background

Generated Apr 10, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Holstein 2 Solar is a proposed 101.7 MW solar generation project located in Nolan County, Texas. The developer is 229HD 8me LLC. The project is in the ERCOT interconnection queue as entry ERCOT-19INR0026, with a queue entry date of December 21, 2016, and a proposed commercial operation date of April 3, 2028. Its interconnection agreement status is currently Facility Study.

The Holstein 2 Solar project has been mentioned in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
  • Queue history observations through: Apr 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Nolan

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

229HD 8me LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

11406 Central Bluff 345kV

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
Nearest Node (Estimated)
HOLSTEIN_ALL

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.