Holstein 2 Solar is a 101 MW Solar+Battery project in Texas, currently active.
229HD 8me LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-04-03.
- Queue ID
- ERCOT-19INR0026
- Location
- Nolan, Texas
- Technology
- Solar+Battery
- Developer
- 229HD 8me LLC
- Market / region
- ERCOT
- Point of interconnection
- 11406 Central Bluff 345kV
What stands out
Holstein 2 Solar is a 101 MW Solar+Battery project in Texas with status active.
229HD 8me LLC is the reported developer.
The reported queue phase is Facility Study; proposed COD is 2028-04-03.
Latest linked story: “OCI Energy and Arava Power to form JV for 260MW SunRoper solar farm project” (NS Energy, 2025-02-21).
Market and operating context
- Queue date
- 2016-12-21
- Proposed COD
- 2028-04-03
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.