Query
Holstein 2 Solar
Type
Entity Briefing
Entity
Holstein 2 Solar
Technology
solar
Generated
2026-10-19T22:30:45.680Z

Briefing on Holstein 2 Solar

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
101 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2028-04-03
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Holstein 2 Solar is a 101 MW Solar+Battery project in Texas, currently active.

229HD 8me LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-04-03.

Queue ID
ERCOT-19INR0026
Location
Nolan, Texas
Technology
Solar+Battery
Developer
229HD 8me LLC
Market / region
ERCOT
Point of interconnection
11406 Central Bluff 345kV

What stands out

1

Holstein 2 Solar is a 101 MW Solar+Battery project in Texas with status active.

2

229HD 8me LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-04-03.

4

Latest linked story: “OCI Energy and Arava Power to form JV for 260MW SunRoper solar farm project” (NS Energy, 2025-02-21).

Market and operating context

Queue date
2016-12-21
Proposed COD
2028-04-03
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Holstein 2 Solar — verified asset snapshot

FieldValue
Queue IDERCOT-19INR0026
LocationNolan, Texas
TechnologySolar+Battery
Developer229HD 8me LLC
Market / regionERCOT
Point of interconnection11406 Central Bluff 345kV
Queue date2016-12-21
Proposed COD2028-04-03