Horse13 CallD repower (ERCOT-17INR0052) — Project Summary

Queue ID
ERCOT-17INR0052
Capacity
44 MW
Technology
Wind
Status
active
Location
Taylor, TX
Region
ERCOT
Developer
Nextera
IA Status
IA Executed

Horse13 CallD repower

ERCOT-17INR0052BetaActiveWindERCOTLBNL + Live

44 MW generation in Taylor, TX · In queue since October 2016 · Proposed COD March 2027

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

44 MW

Capacity

1

Components

Wind

10y 1m

In Queue

IA Executed

IA Phase

Signed May 2019

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

2y 7m

IA → COD

7y 10m

Total Duration

2y 7m

Construction75%
Queue EntryOct 3, 2016

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementMay 22, 2019

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Completed, IA

Project under construction

Typical: 18–36 months

Commercial Operation

Proposed COD: 2027-03-31

Queue history
17INR0052 · 94 monthly ERCOT reports, Dec 2018 – Sep 2026

Projected COD moved

19 times

Nov 2018 → Mar 2027

Net change

+100 months

first report to latest

Capacity

44 MW

unchanged in the reports

Latest stage

Synchronized

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedOct 3, 2016
Facilities study approvedApr 10, 2018
Interconnection agreement signedMay 22, 2019
Approved for synchronizationMar 16, 2021

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Horse13 CallD repower project is a proposed 44 MW wind generation project located in Taylor County, Texas. The developer is Nextera. It is currently active in the ERCOT interconnection queue as entry ERCOT-17INR0052, with a queue entry date of October 3, 2016. The project has a proposed commercial operation date of September 30, 2026.

The project's Interconnection Agreement (IA) has been executed as of May 22, 2019. The point of interconnection (POI) is the 6216 Bluff Creek 138kV. The project has appeared in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Taylor

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Nextera

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

6216 Bluff Creek 138kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
Nearest Node (Estimated)
HHOLLW2_WND1
POI Substation
Bluff Creek Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.