Briefing/owner194 operating assets · 37 queue projects
NextEra Energy includes 29.9 GW of operating capacity and 9.2 GW of proposed queue capacity in the current result.
194 operating plants span 26 states. The linked queue contains 37 projects totaling 9.2 GW. Wind is the largest operating technology group at 29.1 GW.
- Coverage
- 194 plants across 26 states
- Largest asset
- Great Prairie Wind · 1 GW
- Leading technology
- Wind · 29.1 GW
- Queue pipeline
- 37 projects · 9.2 GW
What stands out
1
194 operating plants total 29.9 GW across 26 states.
2
Wind is the largest operating technology group at 29.1 GW across 193 plants.
3
Great Prairie Wind is the largest returned operating asset at 1 GW.
4
37 queue projects total 9.2 GW of proposed capacity.
Market and operating context
- Largest state footprint
- Texas · 8.9 GW
- Technology concentration
- Wind represents 29.1 GW
- Development pipeline
- 37 projects · 9.2 GW
Why it matters
The operating footprint shows what exists today, while the queue pipeline and latest curated events show where the portfolio or market may be changing. Reading those layers together avoids treating proposed capacity as operating capacity.