Cattleman Wind B (ERCOT-16INR0014b) — Project Summary

Queue ID
ERCOT-16INR0014b
Capacity
201.6 MW
Technology
Wind
Status
suspended
Location
Castro, TX
Region
ERCOT
Developer
RWE Renewables Development, LLC
IA Status
Facility Study

Cattleman Wind B

ERCOT-16INR0014bBetaSuspendedWindERCOTLBNL

201.6 MW generation in Castro, TX · In queue since September 2013 · Proposed COD September 2021

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

201.6 MW

Capacity

1

Components

Wind

13y 2m

In Queue

Facility Study

IA Phase

COD target: 2021

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

8 years

Suspended50%
Queue EntrySep 30, 2013

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2021-09-01

Queue history
16INR0014b · 8 monthly ERCOT reports, Dec 2018 – Jul 2019

Projected COD moved

0 times

Sep 2021 → Sep 2021

Net change

0 months

first report to latest

Capacity

202 MW

unchanged in the reports

Latest stage

Screening started

last listed Jul 2019

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedOct 1, 2013
On ERCOT's inactive listAug 2019 – Dec 2021

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

About

Saved background

Generated Apr 10, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Cattleman Wind B project is a proposed 201.6 MW wind generation facility in Castro County, Texas. The project, developed by RWE Renewables Development, LLC, is located within the ERCOT region and interconnected to the tap 345kV 79501 Ogallala - 79502 Windmill point of interconnection.

The project entered the ERCOT interconnection queue as ERCOT-16INR0014b on October 1, 2013. Its interconnection status is currently listed as "suspended" and is in the Facility Study phase.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
  • Queue history observations through: Jul 2019.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Castro

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

RWE Renewables Development, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

tap 345kV 79501 Ogallala - 79502 Windmill

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
POI Substation
Ogallala Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.