Harald (BearKat Wind B)
162.1 MW generation in Glasscock, TX · In queue since November 2013 · Proposed COD December 2026
162.1 MW
Capacity
1
Components
Wind
13 years
In Queue
IA Executed
IA Phase
Signed May 2018
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
4y 6m
IA → COD
8y 7m
Total Duration
4y 6m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
SS Completed, FIS Completed, IA
Project under construction
Typical: 18–36 months
Proposed COD: 2026-12-03
Projected COD moved
52 times
Oct 2019 → Dec 2026
Net change
+86 months
first report to latest
Capacity
162 MW
unchanged in the reports
Latest stage
Synchronized
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.
Milestones in this assessment
Expected commercial operation date per Texas PUC official generator table
ftp.puc.texas.govResearch sources and reasoning (5 recorded sources)
medium confidence at research time
- renewablesnow.com/news/cip-sells-interest-in-196-mw-bearkat-i-wind-farm-in-texas-668599/
- ftp.puc.texas.gov/public/puct-info/industry/electric/reports/genplant/gentable.xls
- cleanview.co/planned-wind-projects/TX/15INR0064b/harald-bearkat-wind-b
- renewablesinfo.org/project/ercot-15inr0064b-harald-bearkat-wind-b
- opensource.gridstatus.io/en/stable/interconnection_queues.html
Commercial operation date: LBNL shows June 2026, but Texas PUC official generator table (gentable.xls) and Cleanview both cite February 2026 as the expected COD. The 4-month difference is minor but research sources are more recent.
Developer: LBNL filing entity is McCrae Wind Energy II, LLC (project SPV). Multiple research sources (renewablesinfo.org, CIP's 2019 sale of BearKat I interest) identify CIP as the actual developer/owner. McCrae is the legal filing entity.
Status: LBNL status is 'active' with IA executed in 2018. No evidence of construction start, withdrawal, or cancellation in any source. Texas PUC and ERCOT records confirm continued planning status.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Harald (BearKat Wind B) project is a proposed 162.1 MW wind generation project located in Glasscock County, Texas. The developer is CIP. It is interconnected within the ERCOT region under queue ID ERCOT-15INR0064b, with an interconnection queue entry date of November 27, 2013. The proposed commercial operation date is April 30, 2026.
The project's interconnection agreement (IA) was executed on May 30, 2018. The point of interconnection is the 59903 Bearkat 345kV substation. The Harald (BearKat Wind B) project has been mentioned in recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Glasscock
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
McCrae Wind Energy II, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
59903 Bearkat 345kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_WEST
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-26
View all articlesHarald (BearKat Wind B)
Data-driven briefing on Harald (BearKat Wind B) — fleet, generation, financial, and news signals.
McCrae Wind Energy II
Data-driven briefing on McCrae Wind Energy II — fleet, generation, financial, and news signals.
Bearkat
Data-driven briefing on Bearkat — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.