Query
Harald (BearKat Wind B)
Type
Entity Briefing
Entity
Harald (BearKat Wind B)
Generated
2026-10-18T14:17:00.644Z

Briefing on Harald (BearKat Wind B)

Entity Briefing
Generated Oct 18, 2026·Dataset freshness not reported
162 MW
Proposed capacity
active
Current status
Wind
Technology
ERCOT
Market / region
2026-06-30
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Harald (BearKat Wind B) is a 162 MW Wind project in Texas, currently active.

McCrae Wind Energy II, is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2026-06-30.

Queue ID
ERCOT-15INR0064b
Location
Glasscock, Texas
Technology
Wind
Developer
McCrae Wind Energy II,
Market / region
ERCOT
Point of interconnection
59903 Bearkat 345kV

What stands out

1

Harald (BearKat Wind B) is a 162 MW Wind project in Texas with status active.

2

McCrae Wind Energy II, is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2026-06-30.

4

Latest linked story: “CIP sells interest in 196-MW Bearkat I wind farm in Texas” (Renewables Now, 2019-09-11).

Market and operating context

Queue date
2013-11-27
Proposed COD
2026-06-30
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Harald (BearKat Wind B) — verified asset snapshot

FieldValue
Queue IDERCOT-15INR0064b
LocationGlasscock, Texas
TechnologyWind
DeveloperMcCrae Wind Energy II,
Market / regionERCOT
Point of interconnection59903 Bearkat 345kV
Queue date2013-11-27
Proposed COD2026-06-30