Harald (BearKat Wind B) is a 162 MW Wind project in Texas, currently active.
McCrae Wind Energy II, is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2026-06-30.
- Queue ID
- ERCOT-15INR0064b
- Location
- Glasscock, Texas
- Technology
- Wind
- Developer
- McCrae Wind Energy II,
- Market / region
- ERCOT
- Point of interconnection
- 59903 Bearkat 345kV
What stands out
Harald (BearKat Wind B) is a 162 MW Wind project in Texas with status active.
McCrae Wind Energy II, is the reported developer.
The reported queue phase is IA Executed; proposed COD is 2026-06-30.
Latest linked story: “CIP sells interest in 196-MW Bearkat I wind farm in Texas” (Renewables Now, 2019-09-11).
Market and operating context
- Queue date
- 2013-11-27
- Proposed COD
- 2026-06-30
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.