Me195SB (EPE-Q25-LG-6-6) — Project Summary

Queue ID
EPE-Q25-LG-6-6
Capacity
195 MW
Technology
Solar+Battery
Status
active
Location
Luna, NM
Region
West
Developer
—
IA Status
In Progress (unknown study)

Me195SB

EPE-Q25-LG-6-6BetaActiveSolarBatteryEPELBNL

195 MW hybrid in Luna, NM · In queue since June 2025 · Proposed COD March 2029

BA: PNMNERC: WECCRC: RCW

195 MW

Capacity

1

Components

Solar

1y 5m

In Queue

In Progress (unknown study)

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 9m

Study Phase

2025 Cluster

In Study38%
Queue EntryJun 6, 2025

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-03-30

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Mar 30, 2029
From queue filing
Developer in saved assessment
—
Status at research time
Active
Active — early-stage queue position filed June 2025, interconnection study in progress
Financing
Not recorded

Milestones in this assessment

IA executedJun 6, 2025Latest in this assessment

Initial interconnection application filed with EPE for 195 MW solar+storage in Luna County

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only LBNL queue data available with proposed COD of March 2029. No independent news or press releases found to validate or contradict this target date.

Developer: LBNL filing shows no developer information. Live search returned no results identifying the project sponsor or operating company behind Me195SB.

Status: LBNL status shows active with IA study in progress. No news coverage found to indicate construction activity, permitting milestones, or project advancement beyond initial queue filing.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Me195SB (queue ID EPE-Q25-LG-6-6) is a proposed solar-plus-battery hybrid development project in Luna County, New Mexico, in the western United States. The project has a total capacity of 195 megawatts (MW). The listed components include a 195 MW solar element, and the project is described as combining solar generation with battery storage. No separate capacity is given for the battery component. The proposed point of interconnection is the Luna-Diablo 345 kV transmission line.

The project is in the interconnection queue of El Paso Electric Company (EPE), which it entered on June 6, 2025. It is being studied as part of EPE's 2025 Cluster and has requested both Network Resource Interconnection Service (NRIS) and Energy Resource Interconnection Service (ERIS). The project's queue status is active, and its interconnection agreement status is listed as in progress, with the specific study stage unknown. The proposed commercial operation date is March 30, 2029. No developer has been publicly identified in the available queue data.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

NM

County

Luna

Grid Region

Mountain West

Market

—

Developer

—

Utility

El Paso Electric Company

Entity

EPE

Service Type

NRIS/ERIS

Point of Interconnection

Luna-Diablo 345 kV line

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
FOURCORNERS
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.