Briefing/projectactive
Me195SB is a 195 MW Solar+Battery project in New Mexico, currently active.
The reported queue phase is 2025 Cluster. Proposed COD is 2029-03-30.
- Queue ID
- EPE-Q25-LG-6-6
- Location
- Luna, New Mexico
- Technology
- Solar+Battery
- Market / region
- West
- Point of interconnection
- Luna-Diablo 345 kV line
What stands out
1
Me195SB is a 195 MW Solar+Battery project in New Mexico with status active.
2
The reported queue phase is 2025 Cluster; proposed COD is 2029-03-30.
Market and operating context
- Queue date
- 2025-06-06
- Proposed COD
- 2029-03-30
- IA status
- In Progress (unknown study)
- Study phase
- 2025 Cluster
- Service type
- NRIS/ERIS
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.