Ea150B (EPE-Q25-LG-6-4) — Project Summary

Queue ID
EPE-Q25-LG-6-4
Capacity
150 MW
Technology
Battery
Status
active
Location
El Paso, TX
Region
West
Developer
—
IA Status
In Progress (unknown study)

Ea150B

EPE-Q25-LG-6-4BetaActiveBatteryEPELBNL

150 MW storage in El Paso, TX · In queue since June 2025 · Proposed COD October 2028

BA: ERCONERC: TRERC: ERCOT

150 MW

Capacity

1

Components

Battery

1y 5m

In Queue

In Progress (unknown study)

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 4m

Study Phase

2025 Cluster

In Study38%
Queue EntryJun 4, 2025

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-10-01

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Oct 1, 2028
From queue filing
Developer in saved assessment
—
Status at research time
Active
Active — queue position secured June 2025, interconnection study in progress
Financing
Not recorded

Milestones in this assessment

IA executedJun 2025Latest in this assessment

Entered EPE interconnection queue, study phase initiated

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only LBNL queue data available with proposed COD of October 2028. No independent news or research sources found to validate or contradict this date.

Developer: LBNL filing shows no developer information. No press releases, corporate announcements, or news coverage found identifying the project sponsor or operating entity.

Status: LBNL status shows active queue position with interconnection agreement in progress. No contradictory signals from research.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Ea150B (queue ID EPE-Q25-LG-6-4) is a proposed 150 MW battery energy storage development project in El Paso County, Texas. The standalone storage project consists of a single battery component rated at 150 MW. It is located in the western United States and would connect to the transmission system of El Paso Electric Company (EPE). The proposed point of interconnection is the Eastlake 115 kV Substation. No developer has been publicly identified in the available queue data.

The project entered El Paso Electric's interconnection queue on June 4, 2025, and is being evaluated as part of the utility's 2025 Cluster study. Its status is active, and it has requested both Network Resource Interconnection Service (NRIS) and Energy Resource Interconnection Service (ERIS). The interconnection agreement is listed as in progress, though the specific study stage has not been reported. The project has a proposed commercial operation date of October 1, 2028.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

El Paso

Grid Region

Mountain West

Market

—

Developer

—

Utility

El Paso Electric Company

Entity

EPE

Service Type

NRIS/ERIS

Point of Interconnection

Eastlake 115 kV Substation

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.