Briefing on Ea150B

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
150 MW
Proposed capacity
active
Current status
Battery
Technology
West
Market / region
2028-10-01
Proposed COD
2025 Cluster
Queue phase
Briefing/projectactive

Ea150B is a 150 MW Battery project in Texas, currently active.

The reported queue phase is 2025 Cluster. Proposed COD is 2028-10-01.

Queue ID
EPE-Q25-LG-6-4
Location
El Paso, Texas
Technology
Battery
Market / region
West
Point of interconnection
Eastlake 115 kV Substation

What stands out

1

Ea150B is a 150 MW Battery project in Texas with status active.

2

The reported queue phase is 2025 Cluster; proposed COD is 2028-10-01.

Market and operating context

Queue date
2025-06-04
Proposed COD
2028-10-01
IA status
In Progress (unknown study)
Study phase
2025 Cluster
Service type
NRIS/ERIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Ea150B — verified asset snapshot

FieldValue
Queue IDEPE-Q25-LG-6-4
LocationEl Paso, Texas
TechnologyBattery
Market / regionWest
Point of interconnectionEastlake 115 kV Substation
Queue date2025-06-04
Proposed COD2028-10-01
IA statusIn Progress (unknown study)