AW300S (EPE-LG-23-3-2) — Project Summary

Queue ID
EPE-LG-23-3-2
Capacity
300 MW
Technology
Solar
Status
active
Location
Sierra, NM
Region
West
Developer
—
IA Status
IA Executed

AW300S

EPE-LG-23-3-2BetaActiveSolarEPELBNL

300 MW generation in Sierra, NM · In queue since March 2023 · Proposed COD December 2029

BA: PNMNERC: WECCRC: RCW

300 MW

Capacity

1

Components

Solar

3y 8m

In Queue

IA Executed

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

6y 9m

Construction75%
Queue EntryMar 31, 2023

Interconnection request submitted to ISO/RTO

Interconnection Study

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2029-12-31

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Dec 31, 2029
From queue filing
Developer in saved assessment
—
Status at research time
Active
Active in the EPE queue with LGIA executed (Westmesa-Arroyo 345kV POI); no public evidence of construction start.
Financing
Not recorded
Research sources and reasoning (3 recorded sources)

low confidence at research time

  1. epelectric.com/el-paso-electric/uploads/epe-interconnection-queue_active.pdf
  2. interconnection.fyi/project/el-paso-electric-lg-23-3-2
  3. infrasure.ai/project/epe-lg-23-3-2-aw300s

Commercial operation date: El Paso Electric's own active-queue PDF (Mar 2026) lists AW300S at 12/31/2029 with 'LGIA EXECUTED', matching LBNL's proposed COD. No news or developer-backed target exists. Infrasure's text gives 2026 once, but its own headline and timeline say 2029, so I treated 2026 as an internal error.

Developer: LBNL lists no developer and no press release or news names one. Infrasure names El Paso Electric Company as developer, but EPE is the interconnecting utility, so I treated that as a generated artifact and not a developer identification.

Status: LBNL shows status active with IA Executed. The EPE queue PDF (Mar 2026) lists the project as active with LGIA executed and a modified COD. No source reports construction, withdrawal, or suspension.

About

Saved background

Generated Apr 10, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The AW300S project is a proposed 300 MW solar generation project located in Sierra County, New Mexico. The project is in the El Paso Electric Company (EPE) interconnection queue (EPE-LG-23-3-2) with a queue entry date of March 31, 2023, and a proposed commercial operation date of December 31, 2026. The interconnection agreement for the project has been executed.

The project, which consists of 300 MW of solar capacity, is interconnected at the Westmesa-Arroyo 345kV point of interconnection. The developer is El Paso Electric Company. The project has appeared in recent news.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

NM

County

Sierra

Grid Region

Mountain West

Market

—

Developer

—

Utility

El Paso Electric Company

Entity

EPE

Service Type

ERIS

Point of Interconnection

Westmesa-Arroyo 345kV

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
FOURCORNERS
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.