LAKE ELSINORE ADVANCED PUMPED STORAGE PROJECT
500 MW storage in Riverside, CA · In queue since June 2005 · Proposed COD December 2028
500 MW
Capacity
1
Components
Other Storage
21y 5m
In Queue
IA Executed
IA Phase
Signed Aug 2012
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
7y 2m
IA → COD
16y 4m
Total Duration
7y 2m
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Active sheet; IA Executed; Serial LGIP
Project under construction
Typical: 6–18 months
Proposed COD: 2028-12-31
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (4 recorded sources)
low confidence at research time
- sbsun.com/2021/12/19/controversial-lake-elsinore-hydroelectric-project-blocked-by-federal-government/
- pressenterprise.com/2023/05/19/lake-elsinore-hydroelectric-project-again-denied-license-application/
- redlandsdailyfacts.com/2022/06/06/battle-rages-anew-over-proposed-2-billion-hydroelectric-plant-in-lake-elsinore/
- lake-elsinore.org/668/Lake-Elsinore-Advanced-Pump-Storage-Proj
Commercial operation date: No news or press release gives a post-LBNL COD, so only the LBNL proposed_cod of 2028-12-31 exists. Coverage of the FERC denial (sbsun, Dec 2021) and the 2023 license denial (Press-Enterprise) makes that date look doubtful.
Developer: LBNL lists no developer. The Press-Enterprise snippet names Nevada Hydro Corp., described by Redlands Daily Facts as a Vista-based company, as the applicant. The name comes from snippets only, so there is nothing in LBNL to compare it to.
Status: LBNL shows the queue position as active and the IA as executed, and no source reports withdrawal or cancellation. Regulatory setbacks make a near-term build unlikely, but the queue status itself is unchanged.
About
Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Lake Elsinore Advanced Pumped Storage Project is a proposed 500 MW pumped storage development in Riverside County, California. The project is located within the CAISO region and is interconnected with San Diego Gas & Electric (SDGE). It entered the CAISO interconnection queue as queue ID CAISO-72 on June 21, 2005, with a proposed commercial operation date of December 31, 2028.
The project's Interconnection Agreement (IA) was executed on August 11, 2012. The point of interconnection (POI) is the proposed Lee Lake Substation at 500 kV. The Lake Elsinore Advanced Pumped Storage Project has been the subject of recent news coverage related to regulatory matters.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- CAISO queue source as of: Oct 24, 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
CA
County
Riverside
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
SDGE
Entity
CAISO
Service Type
NRIS
Point of Interconnection
Proposed Lee Lake Substation 500 kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- CAISO
- Trading Hub
- TH_SP15_GEN-APND
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Battery Storage queue pipeline by status
Data tables and metrics from the InfraSure database.
Battery storage queue pipeline
Summary analysis with parallel narrative sections and visualizations.
Battery Storage queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
LAKE ELSINORE ADVANCED PUMPED STORAGE PROJECT
Data-driven briefing on LAKE ELSINORE ADVANCED PUMPED STORAGE PROJECT — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.