500 MW
Proposed capacity
active
Current status
Battery
Technology
CAISO
Market / region
2028-12-31
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

LAKE ELSINORE ADVANCED PUMPED STORAGE PROJECT is a 500 MW Battery project in California, currently active.

The reported queue phase is IA Executed. Proposed COD is 2028-12-31.

Queue ID
CAISO-72
Location
Riverside, California
Technology
Battery
Market / region
CAISO
Point of interconnection
Proposed Lee Lake Substation 500 kV

What stands out

1

LAKE ELSINORE ADVANCED PUMPED STORAGE PROJECT is a 500 MW Battery project in California with status active.

2

The reported queue phase is IA Executed; proposed COD is 2028-12-31.

Market and operating context

Queue date
2005-06-21
Proposed COD
2028-12-31
IA status
IA Executed
Study phase
IA Executed
Service type
NRIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

LAKE ELSINORE ADVANCED PUMPED STORAGE PROJECT — verified asset snapshot

FieldValue
Queue IDCAISO-72
LocationRiverside, California
TechnologyBattery
Market / regionCAISO
Point of interconnectionProposed Lee Lake Substation 500 kV
Queue date2005-06-21
Proposed COD2028-12-31