Belterra Energy Storage (CAISO-2333) — Project Summary

Queue ID
CAISO-2333
Capacity
514.08 MW
Technology
Battery
Status
active
Location
Calaveras, CA
Region
CAISO
Developer
—
IA Status
Not Started

Belterra Energy Storage

CAISO-2333BetaActiveBatteryCAISOLBNL

514.08 MW storage in Calaveras, CA · In queue since April 2023 · Proposed COD April 2028

BA: CISOISO/RTO: CAISONERC: WECCRC: RCW

514.08 MW

Capacity

1

Components

Battery

3y 7m

In Queue

Not Started

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

5 years

Study Phase

Cluster 15

In Study38%
Queue EntryApr 17, 2023

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-04-01

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Apr 1, 2028
From queue filing
Developer in saved assessment
—
Status at research time
Active
Active in CAISO queue (Cluster 15, Calaveras County, Bellota 230 kV area); IA not started; no evidence of permitting, financing or construction.
Financing
Not recorded
Research sources and reasoning (5 recorded sources)

low confidence at research time

  1. interconnection.fyi/project/caiso-55013
  2. infrasure.ai/project/caiso-2333-belterra-energy-storage
  3. cleanview.co/power-projects/planned/battery-storage-projects/california/55013_storage/belterra-energy-storage
  4. app.nrgmap.com/queues/caiso-2333
  5. caiso.com/Documents/Cluster-15-Interconnection-Requests.xlsx

Commercial operation date: Only queue-derived data exists. Cleanview and InfraSure say 'Expected online 2028' and 'Proposed COD April 2028', but both mirror the LBNL/CAISO filing. No developer press release or news item gives an independent target.

Developer: LBNL developer is null and no search result names a developer or parent for Belterra Energy Storage. The J90 ESS, LLC CEQA result is a different project in Lancaster, Los Angeles County.

Status: LBNL shows active with IA 'Not Started'. Aggregator pages (interconnection.fyi, NRG Map, InterXData) also list it as active, but they derive from the same queue data and add no ground-truth progress.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Belterra Energy Storage is a proposed battery energy storage development project located in Calaveras County, California. The project has a total planned capacity of 514.08 MW, consisting entirely of battery storage. It is situated within the service territory of Pacific Gas and Electric Company (PG&E) and is proposed to connect to the grid at the Bellota 230 kV point of interconnection. No developer is identified in the available data.

The project is listed in the California Independent System Operator (CAISO) interconnection queue under queue ID CAISO-2333, with a queue entry date of April 17, 2023. It is being studied as part of Cluster 15 and has requested Network Resource Interconnection Service (NRIS). As of the most recent data, the project's queue status is active. Its interconnection agreement process has not yet started. The proposed commercial operation date is April 1, 2028.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

CA

County

Calaveras

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

—

Utility

PGAE

Entity

CAISO

Service Type

NRIS

Point of Interconnection

BELLOTA 230 kV

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_NP15_GEN-APND
Hub Confidence
MEDIUM
POI Substation
Bellota Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.