Belterra Energy Storage
514.08 MW storage in Calaveras, CA · In queue since April 2023 · Proposed COD April 2028
514.08 MW
Capacity
1
Components
Battery
3y 7m
In Queue
Not Started
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
5 years
Study Phase
Cluster 15
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-04-01
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (5 recorded sources)
low confidence at research time
- interconnection.fyi/project/caiso-55013
- infrasure.ai/project/caiso-2333-belterra-energy-storage
- cleanview.co/power-projects/planned/battery-storage-projects/california/55013_storage/belterra-energy-storage
- app.nrgmap.com/queues/caiso-2333
- caiso.com/Documents/Cluster-15-Interconnection-Requests.xlsx
Commercial operation date: Only queue-derived data exists. Cleanview and InfraSure say 'Expected online 2028' and 'Proposed COD April 2028', but both mirror the LBNL/CAISO filing. No developer press release or news item gives an independent target.
Developer: LBNL developer is null and no search result names a developer or parent for Belterra Energy Storage. The J90 ESS, LLC CEQA result is a different project in Lancaster, Los Angeles County.
Status: LBNL shows active with IA 'Not Started'. Aggregator pages (interconnection.fyi, NRG Map, InterXData) also list it as active, but they derive from the same queue data and add no ground-truth progress.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Belterra Energy Storage is a proposed battery energy storage development project located in Calaveras County, California. The project has a total planned capacity of 514.08 MW, consisting entirely of battery storage. It is situated within the service territory of Pacific Gas and Electric Company (PG&E) and is proposed to connect to the grid at the Bellota 230 kV point of interconnection. No developer is identified in the available data.
The project is listed in the California Independent System Operator (CAISO) interconnection queue under queue ID CAISO-2333, with a queue entry date of April 17, 2023. It is being studied as part of Cluster 15 and has requested Network Resource Interconnection Service (NRIS). As of the most recent data, the project's queue status is active. Its interconnection agreement process has not yet started. The proposed commercial operation date is April 1, 2028.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
CA
County
Calaveras
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
PGAE
Entity
CAISO
Service Type
NRIS
Point of Interconnection
BELLOTA 230 kV
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- CAISO
- Trading Hub
- TH_NP15_GEN-APND
- Hub Confidence
- MEDIUM
- POI Substation
- Bellota Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Battery Storage queue pipeline by status
Data tables and metrics from the InfraSure database.
Battery storage queue pipeline
Summary analysis with parallel narrative sections and visualizations.
Battery Storage queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Battery Storage queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.