Gosford Solar Storage
304.631 MW generation in Kern, CA · In queue since April 2023 · Proposed COD March 2029
304.631 MW
Capacity
1
Components
Solar
3y 7m
In Queue
Not Started
IA Phase
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
5y 11m
Study Phase
Cluster 15
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-03-30
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (5 recorded sources)
low confidence at research time
- interconnection.fyi/project/caiso-54702
- cleanview.co/power-projects/planned/solar-farms/california/54702_photovoltaic/gosford-solar-storage
- gridalmanac.com/queue/states/california/solar
- interxdata.com/projects/gosford-solar-storage-caiso-2313/
- app.nrgmap.com/queues/caiso-2313
Commercial operation date: Only queue-derived data exists. LBNL lists a proposed COD of 2029-03-30, and Cleanview and interconnection.fyi repeat the same March 2029 date, which looks like a copy of the queue filing rather than a developer-backed target. No press release or news article gives an independent date.
Developer: LBNL developer is null, and none of the search results name a developer or operating company. The aggregator pages show the developer field only as a locked or empty placeholder.
Status: LBNL and several aggregators (interconnection.fyi, GridAlmanac, NRG Map) all list the project as active with IA not started. No evidence of withdrawal, construction, or an executed IA.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Gosford Solar Storage is a proposed solar development project in Kern County, California, with a total capacity of 304.63 MW. Despite the "Storage" in its name, the queue data lists a single solar component of 304.63 MW. The project is listed in the California Independent System Operator (CAISO) interconnection queue under queue ID CAISO-2313, within the Pacific Gas and Electric Company (PG&E) utility service territory. No developer is identified in the available data.
The project entered the CAISO queue on April 17, 2023, and its queue status is active. It is being evaluated as part of CAISO's Cluster 15 study phase and has requested Energy Resource Interconnection Service (ERIS). The proposed point of interconnection is the Bitterwater Switching Station at 230 kV. As of the latest data, work on an interconnection agreement has not started. The project's proposed commercial operation date is March 30, 2029.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
CA
County
Kern
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
PGAE
Entity
CAISO
Service Type
ERIS
Point of Interconnection
BITTERWATER SW STA 230 kV
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- CAISO
- Trading Hub
- TH_SP15_GEN-APND
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Solar queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
can you provide me with the capacity factor for allrenewable facilities in 2024
Data tables and metrics from the InfraSure database.
Gosford Solar Storage
Data-driven briefing on Gosford Solar Storage — fleet, generation, financial, and news signals.
can you provide me with the capacity factor for allrenewable facilities in 2024
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.