Gosford Solar Storage (CAISO-2313) — Project Summary

Queue ID
CAISO-2313
Capacity
304.630524 MW
Technology
Solar
Status
active
Location
Kern, CA
Region
CAISO
Developer
—
IA Status
Not Started

Gosford Solar Storage

CAISO-2313BetaActiveSolarCAISOLBNL

304.631 MW generation in Kern, CA · In queue since April 2023 · Proposed COD March 2029

BA: CISOISO/RTO: CAISONERC: WECCRC: RCW

304.631 MW

Capacity

1

Components

Solar

3y 7m

In Queue

Not Started

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

5y 11m

Study Phase

Cluster 15

In Study38%
Queue EntryApr 17, 2023

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-03-30

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Mar 30, 2029
From queue filing
Developer in saved assessment
—
Status at research time
Active
Active in CAISO queue (Cluster 15 request, Kern County, Bitterwater 230 kV POI); IA not started; no public sign of construction or permitting.
Financing
Not recorded
Research sources and reasoning (5 recorded sources)

low confidence at research time

  1. interconnection.fyi/project/caiso-54702
  2. cleanview.co/power-projects/planned/solar-farms/california/54702_photovoltaic/gosford-solar-storage
  3. gridalmanac.com/queue/states/california/solar
  4. interxdata.com/projects/gosford-solar-storage-caiso-2313/
  5. app.nrgmap.com/queues/caiso-2313

Commercial operation date: Only queue-derived data exists. LBNL lists a proposed COD of 2029-03-30, and Cleanview and interconnection.fyi repeat the same March 2029 date, which looks like a copy of the queue filing rather than a developer-backed target. No press release or news article gives an independent date.

Developer: LBNL developer is null, and none of the search results name a developer or operating company. The aggregator pages show the developer field only as a locked or empty placeholder.

Status: LBNL and several aggregators (interconnection.fyi, GridAlmanac, NRG Map) all list the project as active with IA not started. No evidence of withdrawal, construction, or an executed IA.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Gosford Solar Storage is a proposed solar development project in Kern County, California, with a total capacity of 304.63 MW. Despite the "Storage" in its name, the queue data lists a single solar component of 304.63 MW. The project is listed in the California Independent System Operator (CAISO) interconnection queue under queue ID CAISO-2313, within the Pacific Gas and Electric Company (PG&E) utility service territory. No developer is identified in the available data.

The project entered the CAISO queue on April 17, 2023, and its queue status is active. It is being evaluated as part of CAISO's Cluster 15 study phase and has requested Energy Resource Interconnection Service (ERIS). The proposed point of interconnection is the Bitterwater Switching Station at 230 kV. As of the latest data, work on an interconnection agreement has not started. The project's proposed commercial operation date is March 30, 2029.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

CA

County

Kern

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

—

Utility

PGAE

Entity

CAISO

Service Type

ERIS

Point of Interconnection

BITTERWATER SW STA 230 kV

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_SP15_GEN-APND
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.